Skip to main content

Comprehensive Strategic Risk Management System to Reduce Evaluation Times in Small-Scale Mining Projects

  • Conference paper
  • First Online:
Human Interaction, Emerging Technologies and Future Applications II (IHIET 2020)

Abstract

Mining investment represents high risk for any company within or outside this area, and this has repercussions, above all, for the small companies that do not have any investment capital that they can set aside. The methods used to assess investment projects are traditional, with economic estimates such as the Net Present Value (NPV) to determine the project’s profitability. However, these methods do not assess risk factors or qualitative variables, such as socio-environmental factors or the project’s limitations on a supply chain. Given the uniqueness of each mining project variable, a systematic tool simplifying variable identification and ensuring an accurate evaluation of the mining project in its prefeasibility stage is required. This research aims to create and implement the Risk Management Balanced Scorecard approach as a project evaluation tool that will help reduce the evaluation times and implement the project risk variables, which will be analyzed by a number of experts with great experience in the industry. The results will determine the project viability or non-viability for investment.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 349.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 449.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Espinoza, R.D., Rojo, J.: Towards sustainable mining (Part I): valuing investment opportunities in the mining sector. Resour. Policy 52, 7–18 (2017). https://doi.org/10.1016/j.resourpol.2017.01.011

    Article  Google Scholar 

  2. Stojanović, C.: Evaluating investment projects in mining industry by combining discount method and real option valuation. Acta Montan. Slovaca 18(4), 217–225 (2013). http://search.ebscohost.com/login.aspx?direct=true&db=asn&AN=111476961&lang=es

  3. Park, H.M., Nelson, M.G.: Mining project evaluation process for investment decisions: risk variables in mining projects - part one. Min. Eng. 65(10), 18–21 (2013). http://search.ebscohost.com/login.aspx?direct=true&db=aps&AN=90728828&lang=es

  4. Henderson, R., Turek, C.: Mine planning best practice at kinross gold. Min. Technol. (2013). https://doi.org/10.1179/1743286313Y.0000000041

  5. Liang, W., Zhao, G., Wu, H.: Evaluating Investment risks of metallic mines using an extended TOPSIS method with linguistic neutrosophic numbers. Symmetry (20738994) 9(8), 149 (2017). https://doi.org/10.3390/sym9080149

    Article  Google Scholar 

  6. Alvarado, L., Aranda, S., Vásquez, Y., Raymundo, C.: Socio-environmental risk assessment model in peruvian junior mining exploration projects. In: Proceedings of the 2018 IEEE Sciences and Humanities International Research Conference, SHIRCON 2018 (2018). 8592969

    Google Scholar 

  7. Amoatey, C.T., Famiyeh, S., Andoh, P.: Risk assessment of mining projects in Ghana. J. Qual. Maint. Eng. 23(1) (2017)

    Google Scholar 

  8. Kudełko, J., Wirth, H., Bachowski, C., Gacek, J.: Mining science horizontal integration in the development strategy of mining companies. Min. Sci. 22(114) (2015). https://doi.org/10.5277/msc152209

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Carlos Raymundo-Ibañez .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 The Editor(s) (if applicable) and The Author(s), under exclusive license to Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Loarte-Flores, F., Vasquez-Olivera, Y., Mamani-Macedo, N., Raymundo-Ibañez, C., Dominguez, F. (2020). Comprehensive Strategic Risk Management System to Reduce Evaluation Times in Small-Scale Mining Projects. In: Ahram, T., Taiar, R., Gremeaux-Bader, V., Aminian, K. (eds) Human Interaction, Emerging Technologies and Future Applications II. IHIET 2020. Advances in Intelligent Systems and Computing, vol 1152. Springer, Cham. https://doi.org/10.1007/978-3-030-44267-5_91

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-44267-5_91

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-44266-8

  • Online ISBN: 978-3-030-44267-5

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics