Abstract
The objective of this research is to explain how it significantly influences the application of BIM technology in the formulation of building projects, given the construction deficiencies that currently exist with specialties, as a methodology, a survey of builders is elaborated and also shows the processes of the transition from the 2D model to the new 3D model (BIM). which allows the articulation of specialties during the project formulation process and minimizes failures, errors in the process of execution of the work, as the results were obtained from those surveyed to the builders, that 80% agree that the use of BIM technology due to significantly improved performance and quality of the work, while 20% consider that BIM technology is complicated.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Valdepeñas P, Esteban M, Henche C, Rodríguez R, Fernández G, López J (2020) Application of the BIM Method in the management of the maintenance in port infrastructures. J Mar Sci Eng 8:981. https://doi.org/10.3390/jmse8120981
Sun JJJ, Wang Z, Xu T (2017) The construction of BIM application value system for residential buildings’ design stage in China based on traditional DBB mode. Proc Eng:851–858. https://doi.org/10.1016/j.proeng.2017.04.246
Jacques S, Bissey S, Martín A (2016) Multidisciplinary project based learning within a collaborative framework: a case study on urban drone conception, Revista internacional de tecnologías emergentes en el aprendizaje (iJET) 11(12):36. https://doi.org/10.3991/ijet.v11i12.5996
Koseoglu O, Keskin B, Ozorhon B (2019) Challenges and enablers in BIM-enabled digital transformation in mega projects: the Istanbul new airport project case study. Buildings 9:115. https://doi.org/10.3390/buildings9050115
Adom D, Hussein EK, Adu-Agyem J (2018) Theoretical and conceptual framework: mandatory ingredients of a quality research. Int J Sci Res 7(1):438–441
Succar B (2020) https://bimdictionary.com/en/common-data-environment/1/
ISO 19650-1(2018) 3.3.11 y 3.3.12, modificado
Ramos L, Esenarro D, Rodriguez C, Lagos J (2020) Recovery of public spaces for the conservation of green areas in Tablada Lurin. IOP Conf Ser Mater Sci Eng 910:012020. https://doi.org/10.1088/1757-899X/910/1/01
Tahir MM, Haron NA, Alias AH, Al-Jumaa AT, Muhammad IB (2017) Applications of building information model (BIM) in Malaysian construction industry. IOP Conf Ser Mater Sci Eng 291:012009. https://doi.org/10.1088/1757
Bohorquez F, Esenarro D, Rodriguez C, Tafur V, Tafur G (2021) Modular construction camp as an architectural model and its different construction systems—Moquegua, Perú 2020. Mater Today Proc. https://doi.org/10.1016/j.matpr.04.399
Esenarro D, Escate I, Anco L, Tassara C, Rodriguez C (2020) Proposal for an ecological research center for the recovery and revaluation of biodiversity in the town of Quichas-Lima, Peru. Int J Environ Sci Dev 11(4):212–216. ISSN 2010-0264. https://doi.org/10.18178/ijesd.2020.11.4.1253
Rodriguez C, Esenarro D, Alburquerque C, Vega M, Ramirez V (2020) Theme park of renewable energies for mitigation of CO2 in the urban area of the district of Chorrillos, Peru, IOP Conf Ser Mater Sci Eng 910:012021. https://doi.org/10.1088/1757-899X/910/1/012021
Graphisoft: building together “Copyright © GRAPHISOFT. Todos los derechos reservados” (2020)
Namli E, Isikdag U, Kocakaya MN (2019) Building information management (BIM), a new approach to project management. J Sustain Constr Mater Technol 4(1):323–332. https://doi.org/10.29187/jscmt.2019.36
Namhyuk J, Min KY, Kim JH, Kim J (2020) A study on application of BIM (building information modeling) to pre-design in construction project. https://doi.org/10.1109/ICCIT.2008.190
Namli E, Isikdag U, Kocakaya MN (2019) Building information management (BIM), a new approach to project management. J Sustain Constr Mater Technol 4(1):323–332
Leśniak A, Górka M, Skrzypczak I (2021) Barriers to BIM implementation in architecture, construction, and engineering projects—the polish study. Energies 14:2090. https://doi.org/10.3390/en14082090
Badawy A (2020) Collaboration and BIM model maturity to produce green buildings as an organizational strategy. HBRC J 16(1):243–268. https://doi.org/10.1080/16874048.2020.1807815
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2022 The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Calderón, J.V., Esenarro, D., Rodriguez, C., Segovia, E. (2022). Application of BIM Technology in the Formulation of Building Projects in Peru—2020. In: Kang, T., Lee, Y. (eds) Proceedings of 2021 4th International Conference on Civil Engineering and Architecture. Lecture Notes in Civil Engineering, vol 201. Springer, Singapore. https://doi.org/10.1007/978-981-16-6932-3_52
Download citation
DOI: https://doi.org/10.1007/978-981-16-6932-3_52
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-16-6931-6
Online ISBN: 978-981-16-6932-3
eBook Packages: EngineeringEngineering (R0)