Abstract
This paper studies workforce assignment problem for battery production in a company in Turkey. Several types of batteries are produced in the studied company. Mostly, the operations are semi-automated. In the production process, the workers are assigned to multiple operations irregularly based on the priority of productions. In the company, average utilization of worker is low, and average cycle time of a product is high due to inefficient allocation of the workforce within the operations. In order to analyze the main system problem, we simulate the system and observe the queue lengths to identify the bottlenecks. By dynamic assignment of workers at stations based on real time queue conditions, the workloads can be balanced throughout the production lines. In this project, a simulation-based system improvement is completed by applying: (i) dynamic utilization of workforce to reduce average cycle time of a battery, (ii) assignment of parallel workforce where they can work for the same operation simultaneously, and (iii) observation of real-time queue lengths of stations. Three dynamic assignment policies are developed and compared with each other. The best policy providing minimum cycle time for a battery production is selected to be the best.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Bartholdi, 1993; Kim & Other, 2000; Lee & Others, 2001. A classification of assembly line balancing problems. Eur. J. Oper. Res.
Boysen, N., et al.: A classification of assembly line balancing problems. Eur. J. Oper. Res.183, 674–693 (2007)
Falknauer, E.: Line balancing in the real world. In: Proceedings of The International Conference on Product Lifecycle Management PLM (2005)
Altunay, H., Özmutlu, H.C., Özmutlu, S.: Paralel Görev Atamalı Montaj Hattı Dengeleme Problemi için Yeni Bir Matematiksel Model Önerisi, C.Ü. İktisadi ve İdari Bilimler Dergisi 18(1), 15–33 (2017)
Koruca, H., Aydemir, E.: A priority rule based production scheduling module on Faborg-Sim simulation tool. Gazi Univ. J. Sci. 27(4), 1143–1155 (2014)
Herrmann, J., Proth, J.M., Sauer, N.: Heuristics for unrelated machine scheduling with precedence constraints. Eur. J. Oper. Res. 102(3), 528–537 (1997)
Hui, C.L.P., Ng, S.F.F.: A study of the effect of time variations for assembly line balancing in the clothing industry. Int. J. Clothing Sci. Technol. 11, 181–188 (1999)
Hytonen, J., Niemi, E., Toivonen, V.: Optimal workforce allocation for assembly lines for highly customized low-volume products. Int. J. Serv. Oper. Inf. 3(1), 2008 (2008)
Mendes at al: Combining heuristic procedures and simulation models for balancing pc camera assembly line. Comput. Ind. Eng. 49(2005), 413–431 (2005)
Pinto, P.: A branch and bound algorithm for assembly line balancing with paralleling. Int. J. Prod. Res. 13, 183–196 (1975)
Scholl, A., et al.: State – of –the – art exact and heuristic solution procedures for simple assembly line balancing. Eur. J. Oper. Res. 168, 666–693 (2006). 2008, 580
Shtube, A., Dar-El, E.M.: A methodology for the selection of assembly systems. Int. J. Prod. Res. 27, 175–186 (1989). Scholl, 1999, s. 2
Acknowledgment
This study is supported by TUBITAK (The Scientific and Technological Research Council of Turkey) in the program of “2209-B Undergraduate Research Projects for Industrial Applications Fellowship Program”. We would like to thank our colleagues Serra Nur Çolakoğlu and Yağmur Irmak for their help and contribution to the study.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2022 The Author(s), under exclusive license to Springer Nature Switzerland AG
About this paper
Cite this paper
Erdoğan, A. et al. (2022). Parallel Workforce Assignment Problem for Battery Production. In: Durakbasa, N.M., Gençyılmaz, M.G. (eds) Digitizing Production Systems. Lecture Notes in Mechanical Engineering. Springer, Cham. https://doi.org/10.1007/978-3-030-90421-0_64
Download citation
DOI: https://doi.org/10.1007/978-3-030-90421-0_64
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-90420-3
Online ISBN: 978-3-030-90421-0
eBook Packages: EngineeringEngineering (R0)