Abstract
Multiprocessor scheduling is a well studied NP-hard optimisation problem that occurs in variety of forms. The focus of this paper is explicit modelling of multiple task intervals. This work extends a constraint generation procedure previously developed for an avionics scheduling context. We here address a relaxation of the original problem and this relaxation can be considered as multiprocessor scheduling with precedence relations and multiple intervals. The explicit modelling of multiple intervals strengthens the formulation used in the constraint generation procedure and we illustrate the computational effects on an industrial relevant avionics scheduling problem.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Baltz, A., El Ouali, M., Jäger, G., Sauerland, V., & Srivastav, A. (2015). Exact and heuristic algorithms for the travelling salesman problem with multiple time windows and hotel selection. Journal of the Operational Research Society, 66(4), 615–626.
Blikstad, M., Karlsson, E., Lööw, T., & Rönnberg, E. (2017). An optimisation approach for pre-runtime scheduling of tasks and communication in an integrated modular avionic system. Technical report LiTH-MAT-R–2017/03–SE, Linköping University.
Christiansen, M., & Fagerholt, K. (2002). Robust ship scheduling with multiple time windows. Naval Research Logistics, 49(6), 611–625.
Pesant, G., Gendreau, M., Potvin, J.-Y., & Rousseau, J.-M. (1999). On the flexibility of constraint programming models: From single to multiple time windows for the traveling salesman problem. European Journal of Operational Research, 117(2), 253–263.
Acknowledgements
The work is part of a project funded by the Center for Industrial Information Technology (CENIIT) and the work of Emil Karlsson is supported by the Research School in Interdisciplinary Mathematics at Linköping University.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2018 Springer International Publishing AG, part of Springer Nature
About this paper
Cite this paper
Karlsson, E., Rönnberg, E. (2018). Explicit Modelling of Multiple Intervals in a Constraint Generation Procedure for Multiprocessor Scheduling. In: Kliewer, N., Ehmke, J., Borndörfer, R. (eds) Operations Research Proceedings 2017. Operations Research Proceedings. Springer, Cham. https://doi.org/10.1007/978-3-319-89920-6_75
Download citation
DOI: https://doi.org/10.1007/978-3-319-89920-6_75
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-89919-0
Online ISBN: 978-3-319-89920-6
eBook Packages: Business and ManagementBusiness and Management (R0)