Abstract
Hooghly Estuary is a tide-dominated estuary in the east coast of India, experiencing heavy siltation in the navigation channel. This frequent siltation affects the movement of vessels, thus, hampering the efficiency of the port. The quantity of siltation is related to the physical and environmental conditions and the geometric configuration of the entrance as well as the navigation channels. This study aims at investigating the possibility of smooth navigable channel to the Haldia Dock Complex with a minimum quantity of maintenance dredging. The monitoring of the channel through bathymetry survey at regular intervals has been carried out. The filed survey involved identification of the zones of siltation, changes in the depth and estimation of sediment volumes at 10 different sections along the Eden bar. It was found in the study that the siltation depth varies between the spring and neap tide periods due to the variation in the tidal currents. From the field monitoring surveys, it is found that there is predominant erosion from neap-to-spring tidal cycle. These aspects are brought out in the manuscript along with the stability details of the Eden channel, throughout the year.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Dalrymple RW, Zaitlin BA, Boyd R (1992) Estuarine facies models: conceptual basis and stratigraphic implications: perspective. J Sediment Res 62(6):1130–1146
Nandy Sreetapa, Bandyopadhyay Sunando (2011) Trend of sea level change in the Hugli Estuary India. Indian J Marine Sci 40(6):802–812
Dubey Rajesh P, Samarawickrama S, Gunaratna PP, Halgahawatta L, Pathirana KPP, Raveenthiran K, Subasingha K, Das B, Sugandika TAN (2013) Mathematical model studies for River regulatory measures for the improvement of draft in Hoogly Estuary, India. Evol Trends Eng Technol 2(84):1–12
Sanyal T, Chatterjee AK, Mandal GC (2000) Erosion—Deposition in Hooghly Estuary. Def Sci J 50(3):335–339
Bhaskaran PK, Mangalagiri S, Bonthu S (2014) Dredging maintenance plan for the Kolkata port India. Curr Sci 107(7):1125–1136
Rehitha TV, Ullas N, Vineetha G, Benny PY, Madhu NV, Revichandran C (2017) Impact of maintenance dredging on macrobenthic community structure of a tropical estuary. Ocean Coast Manag 144:71–82
Acknowledgements
The authors wish to record their sincere thanks to the Authorities of Kolkata Port Trust for their valuable support during the survey and technical discussion.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2019 Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Maheshvaran, V., Murali, K., Sundar, V., Chitra, K. (2019). Study on Maintenance Dredging for Navigable Depth Assurance in the Macro-tidal Hooghly Estuary. In: Murali, K., Sriram, V., Samad, A., Saha, N. (eds) Proceedings of the Fourth International Conference in Ocean Engineering (ICOE2018). Lecture Notes in Civil Engineering , vol 23. Springer, Singapore. https://doi.org/10.1007/978-981-13-3134-3_27
Download citation
DOI: https://doi.org/10.1007/978-981-13-3134-3_27
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-13-3133-6
Online ISBN: 978-981-13-3134-3
eBook Packages: EngineeringEngineering (R0)