Skip to main content
Log in

Dispatching, routing, and scheduling of two automated guided vehicles in a flexible manufacturing system

  • Published:
International Journal of Flexible Manufacturing Systems Aims and scope Submit manuscript

Abstract

This article presents a new approach for planning the dispatching, conflict-free routing, and scheduling of automated guided vehicles in a flexible manufacturing system. The problem is solved optimally in an integrated manner, contrary to the traditional approach in which the problem is decomposed in three steps that are solved sequentially. The algorithm is based on dynamic programming and is solved on a rolling time horizon. Three dominance criteria are used to limit the size of the state space. The method finds the transportation plan minimizing the makespan (the completion time for all the tasks). Various results are discussed. A heuristic version of the algorithm is also proposed for an extension of the method to many vehicles.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • BlazewiczJ., EiseltH.A., FinkeG., LaporteG., and WeglarzJ., “Scheduling Tasks and Vehicles in a Flexible Manufacturing System,” International Journal of Flexible Manufacturing Systems, Vol. 4, No. 1, pp. 5–16 (1991).

    Google Scholar 

  • CoC.G. and TanchocoJ.M.A., “A Review of Research on AGVS Vehicle Management,” Engineering Costs and Production Economics, Vol. 21, pp. 35–42 (1991).

    Article  Google Scholar 

  • Daniels, S.C., “Real Time Conflict Resolution in Automated Guided Vehicle Scheduling,” Ph.D. dissertation, Pennsylvania State University, Department of Industrial Engineering (May 1991).

  • DesrochersM. and SoumisF., “A Generalized Permanent Labelling Algorithm for the Shortest Path with Time Windows,” INFOR, Vol. 26, pp. 193–214 (1988).

    Google Scholar 

  • Drolet, M., “Ordonnancement d'un carnet de commandes pour un atelier flexible de sous-traitance,” projet de fin d'études, département de génie industriel, École Polytechnique de Montréal (April 1991).

  • EgbeluP.J. and TanchocoJ.M.A., “Characterization of Automatic Guided Vehicle Dispatching Rules,” International Journal of Production Research, Vol. 22, No. 3, pp. 359–374 (March 1984).

    Google Scholar 

  • Fujii, S., Sandoh, H., and Hohzaki, R., “Routing Control of Automated Guided Vehicles in FMS,” in Proceedings of the USA-Japan Symposium on Flexible Automation, Minneapolis, MN, pp. 629–636 (July 1988).

  • HastingN.A.J. and YehC.-H., “Job Oriented Production Scheduling,” European Journal of Operational Research, Vol. 47, pp. 35–48 (1990).

    Article  Google Scholar 

  • KimChang W. and TanchocoJ.M.A., “Conflict-Free Shortest-Time Bidirectional AGV Routing,” International Journal of Production Research, Vol. 29, No. 12, pp. 2377–2391 (December 1991).

    Google Scholar 

  • KrishnamurthyN.N., BattaR., and KarwanM.H., “Developing Conflict-Free Routes for Automated Guided Vehicles,” Operations Research, Vol. 41, No. 6, pp. 1177–1190 (November/December 1993).

    Google Scholar 

  • Kusiak, A. and Cyrus, P., “Routing and Scheduling of Automated Guided Vehicles,” in Proceedings of the 8th International Conference on Production Research and, 5th Conference of the Fraunhofer-Institute for Industrial Engineering, Springer Verlag, pp. 247–251 (August 1985).

  • MaxwellW.L. and MuckstadtJ.A., “Design of Automatic Guided Vehicle Systems,” IIE Transactions, Vol. 14, No. 2, pp. 114–124 (June 1982).

    Google Scholar 

  • Palekar, U.S., Kapoor, S.G., and Huang, J., A Labelling Algorithm for the Navigation of Automated Guided Vehicles, Working paper, Department of Mechanical and Industrial Engineering, University of Illinois at Urbana-Champaign (June 1990).

  • SabuncuogluI. and HommertzheimD.L., “Dynamic Dispatching Algorithm for Scheduling Machines and Automated Guided Vehicles in a Flexible Manufacturing System,” International Journal of Production Research, Vol. 30, No. 5, pp. 1059–1079, (May 1992).

    Google Scholar 

  • SabuncuogluI. and HommertzheimD.L., “Experimental Investigation of an FMS Due-Date Scheduling Problem: Evaluation of Machine and AGV Scheduling Rules,” International Journal of Flexible Manufacturing Systems, Vol. 5, No. 4, pp. 301–323 (1993).

    Google Scholar 

  • TaghaboniF. and TanchocoJ.M.A., “A LISP-Based Controller for Free-Ranging Automated Guided Vehicle Systems,” International Journal of Production Research, Vol. 26, No. 2, pp. 173–188 (February, 1988).

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Langevin, A., Lauzon, D. & Riopel, D. Dispatching, routing, and scheduling of two automated guided vehicles in a flexible manufacturing system. Int J Flex Manuf Syst 8, 247–262 (1996). https://doi.org/10.1007/BF00403127

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF00403127

Key Words

Navigation