Skip to main content
Log in

Results of 10-year operation of the Kaunassk hydroelectric plant

  • Papers
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature Cited

  1. S. I. Danila and S. P. Bagdonavinchus, “The Kaunassk hydroelectric plant — first stage of the Nyamunassk system,” Gidrotekh. Stroitel'., No. 3 (1963).

  2. S. I. Danila, “Results of initial operation of hydraulic structures in the Kaunassk hydroelectric plant,” Paper presented at the Scientific-Technical Conference on Operation of Hydraulic Structures in Hydroelectric Plants [in Russian], Volgograd (1962).

  3. K. Yu. Dabuzhinskas and K. Yu. Bashkis, “Seepage investigations in hydraulic structures at the Kaunassk hydroelectric plant,” Gidrotekh. Stroitel'., No. 3 (1963).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 5, pp. 38–43, May, 1973.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Danila, S.I. Results of 10-year operation of the Kaunassk hydroelectric plant. Hydrotechnical Construction 7, 471–478 (1973). https://doi.org/10.1007/BF02376351

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02376351

Keywords

Navigation