Resource allocation with project management software

  • Original Papers
  • Published:
OR-Spektrum Aims and scope Submit manuscript

Abstract.

We present results of a benchmark test evaluating the resource allocation capabilities of the project management software packages Acos Plus.1 8.2, CA SuperProject 5.0a, CS Project Professional 3.0, MS Project 2000, and Scitor Project Scheduler 8.0.1. The tests are based on 1560 instances of precedence– and resource–constrained project scheduling problems. For different complexity scenarios, we analyze the deviation of the makespan obtained by the software packages from the best feasible makespan known. Among the tested software packages, Acos Plus.1 and Project Scheduler show the best resource allocation performance. Moreover, our numerical analysis reveals a considerable performance gap between the implemented methods and state–of–the–art project scheduling algorithms, especially for large–sized problems. Thus, there is still a significant potential for improving solutions to resource allocation problems in practice.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Mellentien, C., Trautmann, N. Resource allocation with project management software. OR Spektrum 23, 383–394 (2001). https://doi.org/10.1007/PL00013358

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/PL00013358

Navigation