Skip to main content
Log in

A fast heuristic for quay crane scheduling with interference constraints

  • Published:
Journal of Scheduling Aims and scope Submit manuscript

Abstract

This paper considers the problem of scheduling quay cranes which are used at sea port container terminals to load and unload containers. This problem is studied intensively in a recent stream of research but still lacks a correct treatment of crane interference constraints. We present a revised optimization model for the scheduling of quay cranes and propose a heuristic solution procedure. At its core a Branch-and-Bound algorithm is applied for searching a subset of above average quality schedules. The heuristic takes advantage from efficient criteria for branching and bounding the search with respect to the impact of crane interference. Although the used techniques are quite standard, the new heuristic produces much better solutions in considerably shorter run times than all algorithms known from the literature.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Bierwirth, C., & Meisel, F. (2009). A survey of berth allocation and quay crane scheduling problems in container terminals (Working paper). Martin-Luther-University Halle-Wittenberg, submitted for publication.

  • Daganzo, C. F. (1989). The crane scheduling problem. Transportation Research Part B, 23(3), 159–175.

    Article  Google Scholar 

  • Kim, K. H., & Park, Y. M. (2004). A crane scheduling method for port container terminals. European Journal of Operational Research, 156(3), 752–768.

    Article  Google Scholar 

  • Lim, A., Rodrigues, B., Xiao, F., & Zhu, Y. (2004). Crane scheduling with spatial constraints. Naval Research Logistics, 51(3), 386–406.

    Article  Google Scholar 

  • Lim, A., Rodrigues, B., & Xu, Z. (2007). A m-parallel crane scheduling problem with a non-crossing constraint. Naval Research Logistics, 54(2), 115–127.

    Article  Google Scholar 

  • Liu, J., Wan, Y.-W., & Wang, L. (2006). Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures. Naval Research Logistics, 53(1), 60–74.

    Article  Google Scholar 

  • Meersmans, P. J. M., & Dekker, R. (2001). Operations research supports container handling (Econometric Institute Report 234). Erasmus University Rotterdam.

  • Moccia, L., Cordeau, J.-F., Gaudioso, M., & Laporte, G. (2006). A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal. Naval Research Logistics, 53(1), 45–59.

    Article  Google Scholar 

  • Peterkofsky, R. I., & Daganzo, C. F. (1990). A branch and bound solution method for the crane scheduling problem. Transportation Research Part B, 24(3), 159–172.

    Article  Google Scholar 

  • Pinedo, M. (2002). Scheduling—theory, algorithms, and systems (2nd ed.). Englewood Cliffs: Prentice Hall.

    Google Scholar 

  • Sammarra, M., Cordeau, J.-F., Laporte, G., & Monaco, M. F. (2007). A tabu search heuristic for the quay crane scheduling problem. Journal of Scheduling, 10(4–5), 327–336.

    Article  Google Scholar 

  • Stahlbock, R., & Voß, S. (2008). Operations research at container terminals: a literature update. OR Spectrum, 30(1), 1–52.

    Article  Google Scholar 

  • Steenken, D., Winter, T., & Zimmermann, U. T. (2001). Stowage and transport optimization in ship planning. In M. Grötschel, S. Krumke, & J. Rambau (Eds.), Online optimization of large scale systems (pp. 731–745). Berlin: Springer.

    Google Scholar 

  • Vis, I. F. A., & de Koster, R. (2003). Transshipment of containers at a container terminal: an overview. European Journal of Operational Research, 147(1), 1–16.

    Article  Google Scholar 

  • Winter, T. (1999). Online and real-time dispatching problems. PhD thesis, Technical University Braunschweig.

  • Zhu, Y., & Lim, A. (2006). Crane scheduling with non-crossing constraint. Journal of the Operational Research Society, 57(12), 1464–1471.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Christian Bierwirth.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Bierwirth, C., Meisel, F. A fast heuristic for quay crane scheduling with interference constraints. J Sched 12, 345–360 (2009). https://doi.org/10.1007/s10951-009-0105-0

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10951-009-0105-0

Keywords

Navigation