Approximation algorithms for minimizing the total weighted number of late jobs with late deliveries in two-level supply chains

  • Published:
Journal of Scheduling Aims and scope Submit manuscript

Abstract

We study a supply chain scheduling problem in which n jobs have to be scheduled on a single machine and delivered to m customers in batches. Each job has a due date, a processing time and a lateness penalty (weight). To save batch-delivery costs, several jobs for the same customer can be delivered together in a batch, including late jobs. The completion time of each job in the same batch coincides with the batch completion time. A batch setup time has to be added before processing the first job in each batch. The objective is to find a schedule which minimizes the sum of the weighted number of late jobs and the delivery costs. We present a pseudo-polynomial algorithm for a restricted case, where late jobs are delivered separately, and show that it becomes polynomial for the special cases when jobs have equal weights and equal delivery costs or equal processing times and equal setup times. We convert the algorithm into an FPTAS and prove that the solution produced by it is near-optimal for the original general problem by performing a parametric analysis of its performance ratio.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Agnetis, A., Hall, N. G., & Pacciarelli, D. (2006). Supply chain scheduling: sequence coordination. Discrete Applied Mathematics, 154(15), 2044–2063.

    Article  Google Scholar 

  • Bilgen, B., & Ozkarahan, I. (2004). Strategic tactical and operational production-distribution models: a review. International Journal of Technology Management, 28(2), 151–171.

    Article  Google Scholar 

  • Brucker, P., & Kovalyov, M. Y. (1996). Single machine batch scheduling to minimize the weighted number of late jobs. Mathematical Methods of Operations Research, 43, 1–8.

    Article  Google Scholar 

  • Chen, Z.-L. (2008, to appear). Integrated production and outbound distribution scheduling: review and extensions. Operations Research.

  • Chen, Z.-L., & Hall, N. G. (2007). Supply chain scheduling: conflict and cooperation in assembly systems. Operations Research, 55, 1072–1089.

    Article  Google Scholar 

  • Chen, Z.-L., & Vairaktarakis, G. L. (2005). Integrated scheduling of production and distribution operations. Management Science, 51, 614–628.

    Article  Google Scholar 

  • Dawande, M., Geismar, H. N., Hall, N. G., & Sriskandarajah, C. (2006). Supply chain scheduling: distribution systems. Production and Operations Management, 15(2), 243–261.

    Google Scholar 

  • Gens, G. V., & Levner, E. V. (1979). Discrete optimization problems and efficient approximate algorithms. Engineering Cybernetics, 17(6), 1–11.

    Google Scholar 

  • Gens, G. V., & Levner, E. V. (1981). Fast approximation algorithm for job sequencing with deadlines. Discrete Applied Mathematics, 3(4), 313–318.

    Article  Google Scholar 

  • Graham, R. L., Lawler, E. L., Lenstra, J. K., & Rinnooy Kan, A. H. G. (1979). Optimization and approximation in deterministic sequencing and scheduling: a survey. Annals of Discrete Mathematics, 4, 287–326.

    Article  Google Scholar 

  • Hall, N. G. (2006). Private communication.

  • Hall, N. G., & Potts, C. N. (2003). Supply chain scheduling: batching and delivery. Operations Research, 51(4), 566–584.

    Article  Google Scholar 

  • Hall, N. G., & Potts, C. N. (2005). The coordination of scheduling and batch deliveries. Annals of Operations Research, 135, 41–64.

    Article  Google Scholar 

  • Hochbaum, D. S., & Landy, D. (1994). Scheduling with batching: minimizing the weighted number of tardy jobs. Operations Research Letters, 16, 79–86.

    Article  Google Scholar 

  • Karp, R. M. (1972). Reducibility among combinatorial problem. In R. E. Miller & J. W. Thatcher (Eds.), Complexity of computer computations (pp. 85–103). New York: Plenum.

    Google Scholar 

  • Lee, C. Y., & Chen, Z. L. (2001). Machine scheduling with transportation considerations. Journal of Scheduling, 4, 3–24.

    Article  Google Scholar 

  • Li, C. L., Vairaktarakis, G., & Lee, C. Y. (2005). Machine scheduling with deliveries to multiple customer locations. European Journal of Operational Research, 164, 39–51.

    Article  Google Scholar 

  • Moore, J. M. (1968). An n job, one machine sequencing algorithm for minimizing the number of late jobs. Management Science, 15, 102–109.

    Article  Google Scholar 

  • Pundoor, G., & Chen, Z.-L. (2005). Scheduling a production-distribution system to optimize the tradeoff between tardiness and total distribution cost. Naval Research Logistics, 52, 571–589.

    Article  Google Scholar 

  • Sahni, S. K. (1976). Algorithms for scheduling independent tasks. Journal of the ACM, 23(1), 116–127.

    Article  Google Scholar 

  • Selvarajah, E., & Steiner, G. (2006a). Batch scheduling in a two-level supply chain—a focus on the supplier. European Journal of Operational Research, 173(1), 226–240.

    Article  Google Scholar 

  • Selvarajah, E., & Steiner, G. (2006b). Batch scheduling in customer-centric supply chains. Journal of the Operations Research Society of Japan, 49(3), 174–187.

    Google Scholar 

  • Selvarajah, E., & Steiner, G. (2009). Approximation algorithms for the supplier’s supply chain scheduling problem. Operations Research. doi:10.1287/opre.1080.0622.

    Google Scholar 

  • Steiner, G., & Zhang, R. (2007a). Minimizing the total weighted number of late jobs with late deliveries in two-level supply chains. In Proceedings of the 3rd multidisciplinary international conference on scheduling: theory and application (pp. 447–454), Paris, France, 28–31 August.

  • Steiner, G., & Zhang, R. (2007b). Minimizing the weighted number of late jobs with batch setup times and delivery costs on a single machine. In E. Levner (Ed.), Multiprocessor scheduling: theory and applications (pp. 85–98). Vienna: I-Tech. Publ.

    Google Scholar 

  • Thomas, D. J., & Griffin, P. M. (1996). Coordinated supply chain management. European Journal of Operations Research, 94, 1–15.

    Article  Google Scholar 

  • Williams, J. F. (1981). A hybrid algorithm for simultaneous scheduling of production and distribution in multi-echelon structures. Management Science, 29, 77–92.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to George Steiner.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Steiner, G., Zhang, R. Approximation algorithms for minimizing the total weighted number of late jobs with late deliveries in two-level supply chains. J Sched 12, 565–574 (2009). https://doi.org/10.1007/s10951-009-0109-9

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10951-009-0109-9

Keywords

Navigation