Skip to main content

Advertisement

Log in

Risk-based input–output analysis of hurricane impacts on interdependent regional workforce systems

  • Original Paper
  • Published:
Natural Hazards Aims and scope Submit manuscript

Abstract

Natural disasters, like hurricanes, can damage properties and critical infrastructure systems, degrade economic productivity, and in extreme situations can cause injuries and mortalities. This paper focuses particularly on workforce disruptions in the aftermath of hurricanes. We extend the dynamic inoperability input–output model (DIIM) by formulating a workforce recovery model to identify critical industry sectors. A decision analysis tool is utilized by integrating the economic loss and inoperability metrics to study the interdependent effects of various hurricane intensities on Virginia’s workforce sectors. The extended DIIM and available workforce survey data are incorporated in the decision support tool to simulate various hurricane scenarios. For a low-intensity hurricane scenario, the simulated total economic loss to Virginia’s industry sectors due to workforce absenteeism is around $410 million. Examples of critical sectors that suffer the highest losses for this scenario include: (1) miscellaneous professional, scientific, and technical services; (2) federal general government; (3) state and local government enterprises; (4) construction; and (5) administrative and support services. This paper also explores the inoperability metric, which describes the proportion in which a sector capacity is disrupted. The inoperability metric reveals a different ranking of critical sectors, such as: (1) social assistance; (2) hospitals and nursing and residential care facilities; (3) educational services; (4) federal government enterprises; and (5) federal general government. Results of the study will help identify the critical workforce sectors and can ultimately provide insights into formulating preparedness decisions to expedite disaster recovery. The model was applied to the state of Virginia but can be generalized to other regions and other disaster scenarios.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5

Similar content being viewed by others

References

  • Armstrong D (2011) Hurricane Irene wake: deaths, flooding, blackouts state-by-state, Bloomberg Businessweek. http://www.businessweek.com/news/2011-08-30/hurricane-irene-wake-deaths-flooding-blackouts-state-by-state.html. Accessed 15 Feb 2012

  • Blake ES, Rappaport EN, Landsea CW (2007) The deadliest, costliest, and most intense US tropical cyclones from 1851 to 2006 (and other frequently requested hurricane facts). NOAA Technical Memorandum NWS TPC-5:1–43

  • Bond E, Colavito T, Luong T, Park G, Haimes YY, Santos J (2007) Risk analysis for the security of VDOT smart traffic centers. University of Virginia, pp 1–6

  • Burrus RT, Dumas CF, Farrell CH, Hall WW (2002) The impacts of low-intensity hurricanes on regional economic activity. Nat Hazards Rev 3(2):118–125

    Article  Google Scholar 

  • Crowther KG, Haimes YY, Taub G (2007) Systemic valuation of strategic preparedness with illustrations from hurricane Katrina. Risk Anal 27(5):1345–1364

    Article  Google Scholar 

  • Dominion Virginia Power (2003) Dominion on target for completion of Hurricane Isabel restoration effort. http://www.dom.com/news/elec2003/pr1003.jsp

  • Gokey J, Klein N, Christopher M, Santos J (2009) Development of a prioritization methodology for maintaining virginia’s bridge infrastructure systems. In: Proceedings of the 2009 IEEE systems and information engineering design symposium, pp 252–257

  • Haimes YY, Jiang P (2001) Leontief-based model of risk in complex interconnected infrastructures. J Infrastruct Syst 7(1):1–12

    Article  Google Scholar 

  • Haimes YY, Horowitz BM, Lambert JH, Santos JR, Lian C, Crowther KG (2005) Inoperability input-output model for interdependent infrastructure sectors. I: theory and methodology. J Infrastruct Syst 11(2):67–79

    Article  Google Scholar 

  • Howe D (2005) National planning scenarios. http://media.washingtonpost.com/wp-srv/nation/nationalsecurity/earlywarning/NationalPlanningScenariosApril2005.pdf. Accessed 12 August 2011

  • Leontief WW (1936) Quantitative input and output relations in the economic system of the United States. Rev Econ Stat 18(3):105–125

    Article  Google Scholar 

  • Leontief WW (1951) The structure of the American economy, 1919–1939: An empirical application of equilibrium analysis, 2nd edn. International Arts and Sciences Press, New York

    Google Scholar 

  • Lian C, Haimes YY (2006) Managing the risk of terrorism to interdependent infrastructure systems through the dynamic inoperability input-output model. Syst Eng 9(3):241–258

    Article  Google Scholar 

  • Lin N, Smith JA, Villarini G, Marchok TP, Baeck ML (2010) Modeling extreme rainfall, winds, and surge from hurricane Isabel. Am Meteor Soc 25(5):1342–1343

    Google Scholar 

  • Malmstadt J, Scheitlin K, Elsner J (2009) Florida hurricanes and damage costs. Southeastern Geogr 49(2):108–131

    Article  Google Scholar 

  • National Research Council (NRC) (1999) The impacts of natural disasters: a framework for loss estimation. http://www.nap.edu/openbook.php?isbn=0309063949&page=1. Accessed 15 May 2011

  • Okuyama Y, Chang ES (2004) Modeling spatial and economic impacts of disasters (Advances in Spatial Science), 1st edn., Springer, New York

  • Pielke RA, Gratz J, Landsea CW, Collins D, Saunders MA, Musulin RM (2008) Normalized hurricane damage in the United States: 1900–2005. Nat Hazards Rev 9(1):29–42

    Article  Google Scholar 

  • Qin X, Jiang Y (2011) The impact of natural disaster on absenteeism, job satisfaction, and job performance of survival employees: an empirical study of the survivors in Wenchuan Earthquake. Front Bus Res China 5(2):219–242

    Article  Google Scholar 

  • Remo JWF, Pinter N (2012) Hazus-MH earthquake modeling in the central USA, Nat Hazards. doi:10.1007/s11069-012-0206-5

  • Resurreccion J, Santos J (2011) Developing an inventory-based prioritization methodology for assessing inoperability and economic loss in interdependent sectors. In: Proceedings of the 2011 IEEE Systems and Information Engineering Design Symposium, pp 176–181

  • Santos JR (2006) Inoperability input-output modeling of disruptions to interdependent economic systems. Syst Eng 9(1):20–34

    Article  Google Scholar 

  • Santos JR (2008) Interdependency analysis with multiple probabilistic sector inputs. J Ind Manag Optim 4(3):489–510

    Article  Google Scholar 

  • Santos RJ, Haimes YY (2004) Modeling the demand reduction input-output (I-O) inoperability due to terrorism of interconnected infrastructures. Risk Anal 24(6):1437–1451

    Article  Google Scholar 

  • Schneider PJ, Schauer BA (2006) HAZUS—its development and its future. Nat Hazards Rev 7(1):40–44

    Article  Google Scholar 

  • Virginia Department of Transportation (VDOT) (2003) Midtown tunnel has reopened. http://www.virginiadot.org/news/newsrelease.asp?ID=HRO-0337

  • Webb GR, Tierney KJ, Dahlhamer JM (2000) Businesses and disasters: empirical patterns and unanswered questions. Nat Hazards Rev 1(2):83–90

    Article  Google Scholar 

  • West CT, Lenze DG (1994) Modeling the regional impact of natural disaster and recovery: a generation framework and an application to hurricane Andrew. Int Reg Sci Rev 17(2):121–150

    Article  Google Scholar 

Download references

Acknowledgments

This work was supported in part by the National Science Foundation (NSF) under Award #0963718. The Department of Engineering Management and Systems Engineering in the George Washington University (GWU) also provided additional financial support leading to the completion of this paper. Points of view expressed in this manuscript belong to the authors and do not represent the official positions of NSF and GWU.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Joost R. Santos.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Akhtar, R., Santos, J.R. Risk-based input–output analysis of hurricane impacts on interdependent regional workforce systems. Nat Hazards 65, 391–405 (2013). https://doi.org/10.1007/s11069-012-0369-0

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11069-012-0369-0

Keywords

Navigation