Analysis of cost estimation disclosure in environmental impact statements for surface transportation projects

  • Published:
Transportation Aims and scope Submit manuscript

Abstract

Reliability in cost estimates in publicly funded projects is more important today than ever with increased governmental funding to infrastructure projects and associated accountability requirements, but surface transportation projects, large and small, in the United States have a legacy of cost overruns. The problems with these overruns start with the cost estimation process before projects begin. Studies have shown that early cost estimations reflect best-case scenarios rather than realistic expectations, and have attributed technical, economic, psychological, and political reasons for underestimation. The primary objectives of this research were to determine how costs have been presented and updated in environmental impact statements, to identify endemic technical problems with cost estimation during the environmental review of surface transportation projects, and to develop recommendations for improving cost estimation and disclosure. Cost estimation methods were analyzed from the documents of 100 projects, including draft environmental impact statements, final environmental impact statements, and records of decision. The study concluded that the lack of guidance on how to include cost estimation in environmental review revealed itself in the level of detail and attention given to estimating costs. Agencies omitted or included various aspects of cost estimation randomly. Professional organizations should fill the gap of the need for specific guidance to cost estimation for environmental review so it can evolve as a state of the practice.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3

Similar content being viewed by others

References

  • Anderson, S.D., Molenaar, K.R., Schexnayder, C.J., et al.: Guidance for cost estimation and management for highway projects during planning, programming, and preconstruction. NCHRP Report 574. Transportation Research Board, Washington, D.C. (2007)

    Google Scholar 

  • Barry, R.: For major projects, risk management brings real world rewards. Routes/Roads, No. 329, pp. 56–63 (2006)

  • Bruzelus, N., Flyvbjerg, B., Rothengatter, W.: Big decisions, big risks, improving accountability in mega project, Transport Policy 9, pp. 143–154 (2002)

    Google Scholar 

  • Cantarelli, C., Flyvbjerg, B., Molin, E., Wee, B.: Cost overruns in large-scale transportation infrastructure projects explanations and their theoretical embeddedness. Eur. J. Transp. Infrastruct. Res. 10(1), 5–18 (2010)

    Google Scholar 

  • Crossett, J., Craig, S.: Costs related to compliance with federal environmental laws: Case studies in the Federal-Aid Highway Program. Final Report. Transtech Management, Inc. (2006)

  • Federal Highway Administration NEPA Documentation: Federal Highway Administration website. http://www.environment.fhwa.dot.gov/projdev/docueis.asp (2010). Accessed 1 May 2010

  • Federal Highway Administration: Major Project Program Cost Estimating Guidance. http://www.fhwa.dot.gov/programadmin/mega/cefinal.html (2004). Accessed 1 Dec 2006

  • Flyvbjerg, B.: Policy and planning for large infrastructure projects: problems, causes, cures. World Bank Policy Research Working Paper 3781 (2005)

  • Flyvbjerg, B., Mette, S.H., Soren, B.: Underestimating costs in public works projects: error or lie? APA J. 68(3), 279–294 (2002)

    Google Scholar 

  • Flyvbjerg, B., Mette, S.H., Soren, B.: How common and how large are cost overruns in transport infrastructure projects? Transp. Rev. 23(1), 71–88 (2003)

    Article  Google Scholar 

  • Flyvbjerg, B., Mette, S.H., Soren, B.: What causes cost overrun in transport infrastructure projects? Transp. Rev. 24(1), 3–18 (2004)

    Article  Google Scholar 

  • Gabel, M., Reilly, J.J.: Lifting the veil. Roads Bridges 44(6), 102 (2006)

    Google Scholar 

  • Landis, B.: Cost of route 195 Project has more than doubled since 1993. Provid. J. 26 Nov (2006)

  • Meyer, M., Miller, E.: Urban transportation planning: a decision-oriented approach. McGraw-Hill, New York (2001)

    Google Scholar 

  • Molenaar, K.R.: Programmatic cost risk analysis for highway megaprojects. J. Constr. Eng. Manag. pp. 343–353 (2005)

  • Moore, D.S., McCabe, G.P.: Introduction to the practice of statistics, 4th edn. W. H. Freeman and Company, New York (2003)

    Google Scholar 

  • Pickrell, D.: A desire named streetcar fantasy and fact in rail transit planning. J. Am. Plan. Assoc. pp. 158–176 (1992)

  • Reilly, J.J.: Cost estimating, probable cost, risk identification, and risk management for infrastructure/rail projects. Investing today for a brighter tomorrow, Proceedings of the 2006 rail conference. American Public Transportation Association (2006)

  • Sangrey, D., Keith, S.: Training on cost estimating for major projects. Corson Av Training Room in Seattle. 20–21 Oct (2005)

  • Sangrey, D., Roberds, W., Reilly, J., et al.: Cost and schedule estimates for large transportation projects: a new approach to solving an old problem. The Transportation Factor 2003. Annual Conference and Exhibition of the Transportation Association of Canada. Transportation Association of Canada (2003)

  • Siemiatycki, M.: Managing optimism biases in the delivery of large-infrastructure projects: a corporate performance benchmarking approach. Eur. J. Transp. Infrastruct. Res. 10(1), 30–41 (2010)

    Google Scholar 

  • Sinnette, J.: Building public trust. Public Roads 68(1), pp 16–21, July/August (2004)

    Google Scholar 

  • United States House of Representatives Report 108-792: Report to Congress on Costs Associated with the Environmental Process: Impacts of Federal Environmental Requirements on Federal-Aid Highway Project Costs. A Report to the Committee of Appropriations. Washington, DC. 31 July (2006)

  • Wee, B.: Rail infrastructure: challenges for cost-benefit analysis and other ex ante evaluations. Transp. Plan. Technol. 30(1), 31–48 (2007)

    Article  Google Scholar 

Download references

Acknowledgments

The Federal Highway Administration (FHWA) sponsored and guided this research. In particular, Harold Peaks and Marlys Osterhues in the Office of Project Development and Environmental Review at FHWA contributed critiques and suggestions.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Mashrur Chowdhury.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Sturm, J., Chowdhury, M., Dunning, A. et al. Analysis of cost estimation disclosure in environmental impact statements for surface transportation projects. Transportation 38, 525–544 (2011). https://doi.org/10.1007/s11116-010-9313-x

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11116-010-9313-x

Keywords

Navigation