Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries

  • Published:
KSCE Journal of Civil Engineering Aims and scope Submit manuscript

Abstract

In-planned duration and cost at project closing are the two of criteria of successful project and successful project management. In Vietnam, regularly, construction projects have met delays and cost overruns. This research has employed a questionnaire survey to elicit the causes of this situation by interviewing 87 Vietnamese construction experts. Twenty one causes of delay and cost overruns appropriate with building and industrial construction project were inferred and ranked with respect to frequency, severity and importance indices. Spearman’s rank correlation tests showed that there are no differences in the viewpoints between three principal parties in the project. A comparison of causes of time and cost overruns was done with various selected construction industries in Asia and Africa. Factor analysis technique was applied to categorize the causes, which yielded 7 factors: Slowness and Lack of constraint; Incompetence; Design; Market and Estimate; Financial capability; Government; and Worker. These findings might encourage practitioners to focus on delay and cost overruns problem that might have existed in their present or future projects.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Acharya, N.K., Lee, Y.D., and Im, H.M. (2006). “Investigating delay factors in construction industry: A Korean perspective.” Korean Journal of Construction Engineering and Management, Vol. 10, pp. 177–190.

    Google Scholar 

  • Aibinu, A.A. and Odeyinka, A. (2006). “Construction delays and their causative factors in Nigeria.” J. Constr. Eng. Management, ASCE, Vol. 132, No. 7, pp. 667–677.

    Article  Google Scholar 

  • Assaf, S.A. and Al Hejji, S. (2006). “Causes of delay in large construction projects.” Int. J. Project Management, Vol. 24, pp. 349–357.

    Article  Google Scholar 

  • Berstein, S. and Bernstein, R. (1999). Elements of statistics, Schaum’s Outlines Series, Mc Graw-Hill.

  • Chan, D.W.M. and Kumaraswamy, M.M. (1996), “An evaluation of construction time performance in the building industry.” Building and Environment, Vol. 31, No. 6, pp. 569–578.

    Article  Google Scholar 

  • Chang A. Shing-Tao (2002). “Reasons for cost and schedule increase for engineering design projects.” J. Management Eng., ASCE, Vol. 18, No. 1, pp. 29–36.

    Google Scholar 

  • Dissanayaka, S.M. and Kumaraswamy, M.M. (1999). “Comparing contributors to time and cost performance in building projects.” Building and Environment, Vol. 34, pp. 31–42.

    Article  Google Scholar 

  • Faridi, A.S. and El-Sayegh, S.M. (2006). “Significant factors causing delay in the UAE construction industry.” Construction Management and Economics, Vol. 24, No. 11, pp. 1167–1176.

    Article  Google Scholar 

  • Frimpong, Y., Oluwoye, J., and Crawford, L. (2003). “Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study.” Int. J. Project Management, Vol. 21, pp. 321–326.

    Article  Google Scholar 

  • Vietnam General Statistics Office1 (GSO1). Report of Gross domestic product (Vietnamese), retrieved at: http://www.gso.gov.vn/default.aspx?tabid=388&idmid=3&ItemID=4751

  • Vietnam General Statistics Office2 (GSO2). Report of Capital investment of Vietnamese industries (Vietnamese), retrieved at: http://www.gso.gov.vn/default.aspx?tabid=392&idmid=3&ItemID=6218

  • Institute for Economic Research (IER)-Hochiminh City (2003). Results of economic integration and WTO participation preparation-report of HCM City vice chairman Nhan N.T. (Vietnamese) retrieved at: http://www.vienkinhte.hochiminhcity.gov.vn/xemtin.asp?idcha=1862&cap=4&id=1865

  • Kaming, P.F., Olomolaiye, P.O., Holt, G.D., and Harris, F.C. (1997). “Factors influencing construction time and cost overruns on highrise projects in Indonesia.” Construction Management and Economics, Vol. 15, No. 1, pp. 83–94.

    Article  Google Scholar 

  • Koushki, P.A., Al-Rashid, K., and Kartam, N. (2005). “Delays and cost increases in the construction of private residential projects in Kuwait.” Construction Management and Economics, Vol. 23, No. 3, pp. 285–294.

    Article  Google Scholar 

  • Kumaraswamy, M.M. and Chan, D.W.M. (1998). “Contributors to construction delays.” Construction Management and Economics, Vol. 16, No. 1, pp 17–29.

    Article  Google Scholar 

  • Lo, T.Y., Fung, I.W.H., and Tung, K.C.F. (2006). “Construction delays in Hong Kong civil engineering projects.” J. Constr. Eng. Management, ASCE, Vol. 132, No. 6, pp. 636–649.

    Article  Google Scholar 

  • Long, N.D., Ogunlana, S.O., and Lan, D.T.X. (2004a). “A study on project success factors in large construction projects in Vietnam.” Journal of Engineering, Construction and Architectural, Vol. 11, No. 6, pp. 404–413.

    Article  Google Scholar 

  • Long, N.D., Ogunlana, S., Quang, T., and Lam, K.C. (2004b). “Large construction projects in developing countries: a case study Vietnam.” Int. J. Project Management, Vol. 22, pp. 553–561.

    Article  Google Scholar 

  • Mansfield, N.R., Ugwu, O.O., and Doran, T. (1994). “Causes of delay and cost overruns in Nigeria construction projects.” Int. J. Project Management, Vol. 12, No. 4, pp. 254–260.

    Article  Google Scholar 

  • Ministry of Planning and Investment (2003). Report of supervision and assessment works in 2003, Number:799/BKH-ĐT&GSĐT (Vietnamese).

  • Odeh, A.M. and Battaineh, H.T. (2002). “Causes of construction delay: Traditional contracts.” Int. J. Project Management, Vol. 20, pp. 67–73.

    Article  Google Scholar 

  • Ogunlana, S.O, Promkuntong, K., and Jearkjirm, V. (1996). “Construction delays in a fast-growing economy: comparing Thailand with other countries.” Int. J. Project Management, Vol. 14, No. 1, pp. 37–45.

    Article  Google Scholar 

  • Sambasivan, M. and Soon, Y.W. (2007). “Causes and effects of delays in Malaysian construction industry.” Int. J. Project Management, Vol. 25, pp. 517–526.

    Article  Google Scholar 

  • Sekaran, U. (2003). Research methods for business, A Skill Building Approach, 4th Ed., John Wiley & Sons Inc.

  • Sweis, G., Sweis, R., Hammad, A.A., and Shboul, A. (2007). “Delays in construction projects: The case of Jordan.” Int. J. Project Management, Article in Press.

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Young Dai Lee.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Le-Hoai, L., Lee, Y.D. & Lee, J.Y. Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries. KSCE J Civ Eng 12, 367–377 (2008). https://doi.org/10.1007/s12205-008-0367-7

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12205-008-0367-7

Keywords

Navigation