Skip to main content
Log in

Integrating sustainability into construction project portfolio management

  • Construction Management
  • Published:
KSCE Journal of Civil Engineering Aims and scope

Abstract

Construction project portfolio management has a large impact on many companies as they are often confronted with having more projects to select from than the resources available to execute them. Selecting the wrong projects will lead to wasted resources and loss of benefits which may have been gained by focussing on other projects. While there have been many discussions surrounding portfolio theory, there is currently a lack of framework which integrates sustainability into construction project portfolio management. This paper departs from existing frameworks (which focus more on monetary gains in projects) by proposing robust methods to account for sustainability across two critical stages: I. Screening; II. Optimal portfolio selection. Under the screening stage, sustainability project criteria are proposed followed by the use of second order moment thinking to account for uncertainty in sustainability measurements. The outputs from the screening stage are then used for developing an efficient frontier which facilitates the selection of an optimal portfolio from a sustainability perspective. The originality of this paper is that it aims to integrate sustainability thinking into construction project portfolio management which has not been attempted.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Archer, N. P. and Ghasemzadeh, F. (1999). “An integrated framework for project portfolio selection.” International Journal of Project Management, Vol. 17, No. 4, pp. 207–216, DOI: 10.1016/S0263-7863(98)00032-5.

    Article  Google Scholar 

  • Archer, N. P. and Ghasemzadeh, F. (2000). “Project portfolio selection through decision support.” Decision Support Systems, Vol. 29, No. 1, pp. 73–88, DOI: 10.1016/S0167-9236(00)00065-8.

    Article  Google Scholar 

  • Australian Bureau of Statistics (2003). Construction and the Environment, viewed on 14 February 2015, <http://www.abs.gov.au/ausstats/abs@.nsf/Previousproducts/1301.0Feature%20Article282003?opendocument&tabname=Summary&prodno=1301.0&issue=2003&num=&view=>.

    Google Scholar 

  • Brundtland Report (1987). Our common future: Report of the world commission on environment and development, United Nations, viewed on 14 February 2015, <http://www.un-documents.net/ocf-02.htm>.

    Google Scholar 

  • Carazo, A. F., Gomez, T., Molina, J., Hernandez-Diaz, A. G., Guerrero, F. M., and Caballero, R. (2010). “Solving a comprehensive model for multiobjective project portfolio selection.” Computers and Operations Research, Vol. 37, No. 4, pp. 630–639, DOI: 10.1016/j.cor.2009.06.012.

    Article  MathSciNet  Google Scholar 

  • Carlsson, C., Fuller, R., Heikkila, M., and Majlender, P. (2007). “A fuzzy approach to r&d project portfolio selection.” International Journal of Approximate Reasoning, Vol. 44, No. 2, pp. 93–105, DOI: 10.1016/j.ijar.2006.07.003.

    Article  MathSciNet  Google Scholar 

  • Carmichael, D. G. (2006). Project planning, and control, Taylor and Francis, London.

    Book  Google Scholar 

  • Carmichael, D. G. and Balatbat, M. C. A. (2008). “Probabilistic DCF analysis, and capital budgeting and investment- A survey.” The Engineering Economist, Vol. 53, No. 1, pp. 84–102, DOI: 10.1080/00137910701864809.

    Article  Google Scholar 

  • Constructing Excellence (2007). Why is sustainable construction important? Joint UK-Sweden Initiative, viewed on 4 April 2013, <http://www.ukswedensustainability.org/background/framework.jsp>.

    Google Scholar 

  • Doerner, K. F., Gutjahr, W. J., Hartl, R. F., Strauss, C., and Stummer, C. (2006). “Pareto ant colony optimization with ILp preprocessing in multiobjective project portfolio selection.” European Journal of Operational Research, Vol. 171, No. 3, pp. 830–841, DOI: 10.1016/j.ejor.2004.09.009.

    Article  MathSciNet  Google Scholar 

  • Fama, E. F. and French, K. R. (2005). “The capital asset pricing model: theory and evidence (Digest Summary).” Journal of Economic Perspectives, Vol. 35, No. 2, pp. 325–346, DOI: http://dx.doi.org/10.2469/dig.v35.n2.1671.

    Google Scholar 

  • Fernandez-Sanchez, G. and Rodrguez-Lopez, F. (2010). “A methodology to identify sustainability indicators in construction project managementapplication to infrastructure projects in Spain.” Ecological Indicators, Vol. 10 No. 6, pp. 1193–1201, DOI: 10.1016/j.ecolind.2010.04.009.

    Article  Google Scholar 

  • Guo, N. and Yu, S. W. (2013). “The necessity of project portfolio management in the construction industry of China Mainland.” Applied Mechanics and Materials, No. 357–360, pp. 2238–2241. DOI: 10.4028/www.scientific.net/AMM.357-360.2238.

    Article  Google Scholar 

  • Gutjahr, W. J., Katzensteiner, S., Reiter, P., Stummer, C., and Denk, M. (2008). “Competence-driven project portfolio selection, scheduling and staff assignment.” Central European Journal of Operations Research, Vol. 16, No. 3, pp. 281–306, DOI: 10.1007/s10100-008-0057-z.

    Article  MathSciNet  Google Scholar 

  • Gutjahr, W. J., Katzensteiner, S., Reiter, P., Stummer, C., and Denk, M. (2010). “Multi-objective decision analysis for competence-oriented project portfolio selection.” European Journal of Operational Research, Vol. 205, No. 3, pp. 670–679, DOI: 10.1016/j.ejor.2010.01.041.

    Article  MathSciNet  Google Scholar 

  • Hernandez, C., Pajares, J., and Lopez-Paredes (2011). “A portfolio inspired metric for project selection in construction management, organization.” Technology and Management in Construction, Vol. 3, No. 1, pp. 264–268, DOI: 10.5592/otmcj.2011.1.6.

    Google Scholar 

  • Hu, G., Wang, L. Fetch, S., and Bidanda, B. (2008). “A multi-objective model for project portfolio selection to implement lean and six sigma concepts.” International Journal of Production Research, Vol. 46, No. 23, pp. 6611–6625, DOI: 10.1080/00207540802230363.

    Article  Google Scholar 

  • Kangari, R. and Riggs, L. S. (1988). “Portfolio Management in Construction.” Construction Management and Economics, Vol. 6, No. 2, pp. 161–169, DOI: 10.1080/01446198800000014.

    Article  Google Scholar 

  • Karapetrovic, S. and Willborn, W. (1999). “Holonic model for a quality system in academia.” International Journal of Reliability and Quality Management, Vol. 16, No. 5, pp. 457–485, DOI: 10.1108/02656719910249847.

    Article  Google Scholar 

  • Kibert, C. J. (2005). Sustainable construction green building design delivery, Hoboken, John Wiley & Sons.

    Google Scholar 

  • Le, M. C. and Nguyen, V. T. (2007). Strategy for project portfolio selection in private corporations in Vietnam, MSc Thesis, Autumn 2007, UMEA, School of Business, Sweden.

    Google Scholar 

  • Markowitz, H. (1952). “Portfolio selection.” Journal of Finance, Vol. 7, No. 1, pp. 77–91, DOI: 10.1111/j.1540-6261.1952.tb01525.x.

    Google Scholar 

  • Merton, R. C. (1972). “An analytic derivation of the efficient portfolio frontier.” Journal of Financial and Quantitative Analysis, Vol. 7, No. 4, pp. 1851–1872, DOI: 10.1.1.318.7756.

    Article  Google Scholar 

  • Meskendahl, S. (2010). “The influence of business strategy on project portfolio management and its success — A conceptual Framework.” International Journal of Project Management, Vol. 28, No. 8, pp. 807–817, DOI: 10.1016/j.ijproman.2010.06.007.

    Article  Google Scholar 

  • Muller, H. H. (1988). “Modern portfolio theory: Some main results.” ASTIN Bulletin, Vol. 18, No. 2, pp. 127–145, DOI: 10.2143/AST.18.2.2014947.

    Article  Google Scholar 

  • Rao, R. V. and Gandhi, O. P. (2002). “Digraph and matrix methods for the machinability evaluation of work materials.” International Journal of Machine Tools and Manufacture, Vol. 42, No. 3, pp. 321–330, DOI: 10.1016/S0890-6955(01)00133-X.

    Article  Google Scholar 

  • Reyck, B. D., Grushka-Cockayne, Y., Lockett, M., Calderini, S. R., Moura, M., and Sloper, A. (2005). “The impact of project portfolio management on information technology projects.” International Journal of Project Management, Vol. 23, No. 7, pp. 524–537, DOI: 10.1016/j.ijproman.2005.02.003.

    Article  Google Scholar 

  • Roychoudhury, S. (2007). The optimal portfolio and the efficient frontier, Capital University, viewed on 15 February 2015, <http://www.capital.edu/uploadedFiles/Capital/Academics/Schools_and_Departments/Natural_Sciences,_Nursing_and_Health/Computational_Studies/Educational_Materials/Finance_and_Economics/portfolio30107.pdf>.

    Google Scholar 

  • Saaty, T. L. (1980). The analytic hierarchy process: Planning, priority setting, Resource Allocation, McGraw Hill International Book Co., New York and London.

    Google Scholar 

  • Siew, R. Y. J. (2014a). Evaluating and enhancing the impact of sustainability reporting Tools (SRTs), PhD Thesis School of Civil and Environmental Engineering, University of New South Wales, Sydney, July 2014.

    Google Scholar 

  • Siew, R. Y. J. (2014b). Alternative framework for assessing sustainable building funds: Green building fund (in print), Building Research & Information, viewed on 21 November 2014, <http://www.tandfonline.com/doi/abs/10.1080/09613218.2014.936170#.VJeRRsBA>.

    Google Scholar 

  • Siew, R. Y. J. (2014c). “A review of sustainability reporting tools (SRTs) for Communities.” International Journal of Sustainable Construction Engineering and Technology, Vol. 5, No. 2, pp. 39–52, ISSN: 2180-3242.

    Google Scholar 

  • Siew, R. Y. J., Balatbat, M. C. A., and Carmichael, D. G. (2013). “A review of building/infrastructure Sustainability Reporting Tools (SRTs).” Smart and Sustainable Built Environment, Vol. 2, No. 2, pp. 106–139, DOI: 10.1108/SASBE-03-2013-0010.

    Article  Google Scholar 

  • Stummer, C., Kiesling, E., and Gutjahr, W. J. (2009). “A multicriteria decision support system for competence-driven project portfolio selection.” International Journal of Information Technology & Decision Making, Vol. 8, No. 2, pp. 379–401, DOI: 10.1142/S0219622009003429.

    Article  Google Scholar 

  • Tong, T. K. L., Tam, C. M., and Chan, A. P. C. (2001). “Genetic algorithm optimization in building portfolio management.” Construction Management and Economics, Vol. 19, No. 6, pp. 601–609, DOI: 10.1080/01446190110062096.

    Article  Google Scholar 

  • Voros, J. (1985). “Portfolio analysis-an analytic derivation of the efficient portfolio frontier.” European Journal of Operational Journal, Vol. 23, No. 3, pp. 294–300, DOI: 10.1016/0377-2217(86)90295-X.

    MathSciNet  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Renard Yung Jhien Siew.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Siew, R.Y.J. Integrating sustainability into construction project portfolio management. KSCE J Civ Eng 20, 101–108 (2016). https://doi.org/10.1007/s12205-015-0520-z

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12205-015-0520-z

Keywords

Navigation