Abstract
Regulation of river systems has led to the development of irrigated agriculture and other uses of this engineered additional water supply. One of the main environmental drawbacks from regulation of river systems has been a shift in the seasonality of flow of these rivers. One such river is the River Murray, Australia. A common concern for the River Murray is a decreased incidence of winter and spring flooding of floodplains. A lesser known problem is the increased incidence of unseasonal flooding of the Barmah-Millewa Forest (B-MF) around the Barmah Choke on the River Murray. These flood events have often been said to be created by ‘rain rejection events’. Rain rejection events are the rejection of advanced irrigation orders by irrigators due to rainfall on their properties meaning this previously requested water goes unutilised. This paper investigates the causes of unutilised irrigation orders (UIO) and takes a holistic view to investigate the variables affecting unseasonal flooding of the B-MF. It is concluded from this research that unseasonal flooding of the B-MF can be linked to UIO but there are other more significant factors; inflow from Ovens River particularly during December, River Murray flow at Albury and the available airspace in the River Murray at Tocumwal. UIO were found to be linked to the previous day’s UIO, rainfall and the advanced order volume placed four days prior.
Similar content being viewed by others
References
Bren L (1988a) Effects of river regulation on flooding of a riparian red gum forest on the River Murray, Australia. Regul Rivers 2:65–77
Bren L (1988b) Flooding characteristics of a riparian red gum forest. Aust For 51:57–62
Bren L (1992) Tree invasion of an intermittent wetland in relation to changes in the flooding frequency of the River Murray, Australia. Aust J Ecol 17:395–408
Bren L, Gibbs N (1986) Relationships between flood frequency, vegetation and topography in a river red gum forest. Aust For Res 17:127–144
Bren L, O'Neill I, Gibbs N (1987) Flooding of the Barmah Forest and its relation to flow in the Murray–Edward River System. Aust For Res 17:127–144
Bren L, O'Neill I, Gibbs N (1988) Use of map analysis to elucidate flooding in an Australian riparian river red gum forest. Water Resour Res 24(7):1152–1162
Bryan B, Barvanek S (2004) Quantifying and valuing land use changes for integrated catchment management and evaluation in the Murray Darling Basin, 1996/7–2000/01. CSIRO Land and Water Client Report, Canberra, Australia
Chesterfield EA (1986) Changes in the vegetation of the river red gum forest at Barmah, Victoria. Aust For 49:4–15
Chong J (2003) Analysis and management of unseasonal surplus flows in the Barmah-Millewa Forest. Cooperative Research Centre for Catchment Hydrology, Melbourne, Australia
Chong J, Ladson AR (2003) Analysis and management of unseasonal flooding in the Barmah-Millewa Forest, Australia. River Research and Application 19:161–180
DIPNR (2004) Water sharing plan for the Murray and Lower Darling Regulated Rivers Water Sources. Department of Infrastructure, Planning and Natural Resources, Australia
GHD (2006) Engineering and Economic Assessment of the Proposed Storage at “The Drop"; Milestone 3 Report – Draft Feasibility Assessment.
Helsel DR, Hirsch RM (1992) Statistical methods in water resources. Elsevier, New York
Hillman TJ, Quinn GP (2002) Temporal changes in macroinvertebrate assemblages following experimental flooding in permanent and temporary wetlands in an Australian floodplain forest. River Research and Application 18:137–154
Holmes JW (1974) Future management and planning. In: The Murray Waters: Man, Nature and a River System, Angus and Robertson, Sydney
Humphreys E, Edraki M, Bethune M (2003) Deep drainage & crop water use for irrigated annual crops & pastures in Australia – a review of determinations in fields & lysimeters. CSIRO, Griffith
Maheshwari BL, Plunkett M, Singh P (2003) Farmers’ perceptions about irrigation scheduling in the Hawkesbury-Nepean catchment. APEN, Hobart
Maunsell (1992) Barmah-Millewa Forests Water Management Plan. Murray Darling Basin Commision
Thoms M, Suter P, Roberts J, Koehn J, Jones G, Hillman T, Close A (2000) Report of River Murray Scientific Panel on Environmental Flows
Ward KA, Leitch C, Lloyd LN, Atking BP (1994) Interim water management strategy for Barmah Forest, Victoria. Natural Resources Management Strategy of the Murray–Darling Basin Ministerial Council, Canberra
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Berrisford, M.J., Argent, R.M. & Malano, H.M. Causes and Consequences of Unutilised Irrigation Orders in the Central River Murray Area. Water Resour Manage 23, 193–217 (2009). https://doi.org/10.1007/s11269-008-9271-7
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11269-008-9271-7