Abstract
Rural infrastructure (RI) projects face multiple obstacles, such as unavailability of materials and machinery, poor estimation, failure in documentation, cost overrun during their operations. The current study identifies a method to surpass the encountered challenges. Building information modelling (BIM), a construction management process, has been adopted in various fields for acquiring efficient construction deliverables in a project lifecycle. Previous researchers have focused on enhancing and applying the BIM framework for infrastructure projects in urban areas such as airports, bridges, highways, and tunnels. However, the application of BIM in a rural scenario is minimal, and its execution for overcoming the hurdles faced in RI projects remains a gap. The current research work modifies BIM in a rural viewpoint, as rural BIM (R-BIM) framework, by incorporating essential attributes based on previously performed rural studies to get over the uncertainties. The R-BIM framework explores various dimensions emphasising a rural water management (RWM) project and highlights the operation of the BIM cloud with the engagement of concerned stakeholders.
Similar content being viewed by others
References
Abbasnejad, B., Nepal, M. P., Ahankoob, A., Nasirian, A., & Drogemuller, R. (2020). Building information modelling (BIM) adoption and implementation enablers in AEC firms: A systematic literature review. Architectural Engineering and Design Management. https://doi.org/10.1080/17452007.2020.1793721
Abbondati, F., Biancardo, S. A., Palazzo, S., Capaldo, F. S., & Viscione, N. (2020). I-BIM for existing airport infrastructures. Transportation Research Procedia, 45(2019), 596–603. https://doi.org/10.1016/j.trpro.2020.03.052
Abbondati, F., Oreto, C., Viscione, N., & Biancardo, S. A. (2020b). Rural Road Reverse Engineering Using BIM: an Italian Case Study. In The 11th International Conference Environmental Engineering, ICEE, 11, 1–7 May 21–22.
Acampa, G., Bona, N., Grasso, M., & Ticali, D. (2018). BIM: Building information modeling for infrastructures. AIP Conference Proceedings, 2040(1), 140008. https://doi.org/10.1063/1.5079197
Acampa, G., Marino, G., & Ticali, D. (2019). Validation of infrastructures through BIM. AIP Conference Proceedings. https://doi.org/10.1063/1.5138079
Al-Rubaye, Z. R. A., & Mahjoob, A. M. R. (2020). Using measured mile method to quantify the loss of labor productivity in Iraqi construction site. Asian Journal of Civil Engineering, 21(7), 1287–1296. https://doi.org/10.1007/s42107-020-00277-5
Alwisy, A., Bu Hamdan, S., Barkokebas, B., Bouferguene, A., & Al-Hussein, M. (2019). A BIM-based automation of design and drafting for manufacturing of wood panels for modular residential buildings. International Journal of Construction Management, 19(3), 187–205. https://doi.org/10.1080/15623599.2017.1411458
Arunkumar, S., Suveetha, V., & Ramesh, A. (2018). A feasibility study on the implementation of building information modeling (BIM): From the architects’ & engineers’ perspective. Asian Journal of Civil Engineering, 19(2), 239–247. https://doi.org/10.1007/s42107-018-0020-9
Asthana, A. N. (2010). Is participatory water management effective? Evidence from Cambodia. Water Policy, 12(2), 149–164. https://doi.org/10.2166/wp.2009.050
Badu, E., Owusu-Manu, D. G., Edwards, D. J., Adesi, M., & Lichtenstein, S. (2013). Rural infrastructure development in the Volta region of Ghana: Barriers and interventions. Journal of Financial Management of Property and Construction, 18(2), 142–159.
Benard, M. M., & Iminza, R. M. (2020). Effective Project Management for Sustainable Rural Development in Africa. International Journal of Academic Research in Business and Social Sciences, 10(8), 788–806. https://doi.org/10.6007/ijarbss/v10-i8/7637
Bråthen, K., & Moum, A. (2016). Bridging the gap: Bringing BIM to construction workers. Engineering, Construction and Architectural Management, 23(6), 751–764. https://doi.org/10.1108/ECAM-01-2016-0008
Brushett, S., & John-abraham, I. (2006). Infrastructure for improved rural livelihoods. Development, 93, 1–4.
Campisi, T., Acampa, G., Marino, G., & Tesoriere, G. (2020). Cycling master plans in Italy: The I-BIM feasibility tool for cost and safety assessments. Sustainability (switzerland). https://doi.org/10.3390/su12114723
Cao, D., Wang, G., Li, H., Skitmore, M., Huang, T., & Zhang, W. (2015). Practices and effectiveness of building information modelling in construction projects in China. Automation in Construction, 49, 113–122. https://doi.org/10.1016/j.autcon.2014.10.014
Caro-Borrero, A., Carmona-Jiménez, J., & Figueroa, F. (2020). Water resources conservation and rural livelihoods in protected areas of central Mexico. Journal of Rural Studies, 78(February), 12–24. https://doi.org/10.1016/j.jrurstud.2020.05.008
Choudhry, R. M., Fang, D., & Rowlinson, S. (2008). Challenging and enforcing safety management in developing countries: A strategy. International Journal of Construction Management, 8(1), 87–101. https://doi.org/10.1080/15623599.2008.10773110
Construction Management Software. (2019). Connect your workflows, teams, and data.https://www.autodesk.com/bim-360/. Accessed 17 Dec 2019.
Czmoch, I., & Pękala, A. (2014). Traditional design versus BIM based design. Procedia Engineering, 91(TFoCE), 210–215. https://doi.org/10.1016/j.proeng.2014.12.048
Ding, L., Zhou, Y., & Akinci, B. (2014). Building information modeling (BIM) application framework: The process of expanding from 3D to computable nD. Automation in Construction, 46, 82–93. https://doi.org/10.1016/j.autcon.2014.04.009
Haghir, S., Haghnazar, R., Saghafi Moghaddam, S., Keramat, D., Matini, M. R., & Taghizade, K. (2021). BIM based decision-support tool for automating design to fabrication process of freeform lattice space structure. International Journal of Space Structures, 36(3), 164–179. https://doi.org/10.1177/09560599211033867
Hajela, R. (2012). Shortage of skilled workers : A paradox of the indian economy, 111. http://www.cardiff.ac.uk/socsi/research/researchcentres/skope/publications/researchpapers/WP111.pdf. Accessed 20 June 2021.
Hassan R., Saetre F., Oyvang K, A. (2016). Trends and practices using 3D visualisations for large-scale landscape projects in Norway. http://papers.cumincad.org/cgi-bin/works/Show?ascaad2016_029 . Accessed 24 May 2020.
Huang, M., Li, J., & Liao, C. (2018). The role of BIM technology in energy-saving reconstruction of existing residential buildings in rural areas. In 7th International Conference on Energy and Environmental Protection (ICEEP 2018), Advances in Engineering Research (Vol. 170, pp. 627–631). Atlantis Press. https://doi.org/10.2991/iceep-18.2018.110.
Integrated Schedule of Rates. (2017). https://urban.rajasthan.gov.in/content/dam/raj/udh/organizations/ruidp/Downloads/BSR/RUIDPISOR-2017.pdf. Accessed 10 Sep 2019.
Intelligent HQ. (2021). BIM dimensions: 3D, 4D, 5D, 6D and 7D BIM—Explained. https://www.intelligenthq.com/bim-dimensions-3d-4d-5d-6d-7d-bim-explained/. Accessed 10 Jan 2021.
Kamal, E. M., & Flanagan, R. (2014). Key characteristics of rural construction SMEs. Journal of Construction in Developing Countries, 19(2), 1–13.
Kaura, T. H., Emmanuel, R., & Dauda, I. (2018). Assessment of building constitution planning and foundation work practice of craftsmen in rural areas in Zamfara State, Nigeria. http://repository.futminna.edu.ng:8080/xmlui/bitstream/handle/123456789/10503/Assessment%20of%20Building%20Constitution%20Planning%20and%20Foundation%20Work%20Practice%20of%20Craftsmen%20in%20Rural%20Areas%20in%20Zamfara%20State%2c%20Nigeria.pdf?sequence=1&isAllowed=y. Accessed 5 Jan 2021.
Kaveh, A., & Vazirinia, Y. (2020). An upgraded sine cosine algorithm for tower crane selection and layout problem. Periodica Polytechnica Civil Engineering, 64(2), 325–343. https://doi.org/10.3311/PPci.15363
Keng, T. C., & Shahdan, N. (2015). The application of earned value management (EVM) in construction project management. Journal of Technology Management and Business 2(2).
Kenley, R., & Harfield, T. (2015). Construction project control methodologies and productivity improvement: EVM, BIM, LBM. https://survey.unitec.ac.nz/bitstream/handle/10652/3400/Construction%20Project%20Control%20Methodologies%20and%20Productivity%20Improvement_EVM.pdf?sequence=3&isAllowed=y. Accessed 22 Oct 2020.
Khanzadi, M., Kaveh, A., Moghaddam, M. R., & Pourbagheri, S. M. (2019). Optimisation of building components with sustainability aspects in BIM environment. Periodica Polytechnica Civil Engineering, 63(1), 93–103. https://doi.org/10.3311/PPci.12551
Lamaddalena, N., D’arcangelo, G., Billi, A., Todorovic, M., Hamdy, A., Bogliotti, C., & Quarto, A. (2004). Participatory water management in Italy: Case study of the consortium “bonifica della capitanata.” Participatory Water Saving Management and Water Cultural Heritage, 169, 159–169.
Li, X., Wu, P., Shen, G. Q., Wang, X., & Teng, Y. (2017). Mapping the knowledge domains of building information modeling (BIM): A bibliometric approach. Automation in Construction, 84(October 2016), 195–206. https://doi.org/10.1016/j.autcon.2017.09.011
Liang, X., & Yue, X. (2021). Challenges facing the management of wastewater treatment systems in Chinese rural areas. Water Science and Technology, 84(6), 1518–1526.
Lukale, A. M. (2018). Determinants of cost overruns in rural roads infrastructure projects in Kenya. 1–115. https://su-plus.strathmore.edu/handle/11071/6118. Accessed 15 Dec 2020.
Lukas, J. A. (2012). How to make earned value work on your project. In PMI Global Congress 2012—Vancouver, British Columbia, Canada. Project Management Institute.
McAnulty, S., & Baroudi, B. (2010). Construction challenges in remote Australian locations. In Association of Researchers in Construction Management, ARCOM 2010—Proceedings of the 26th Annual Conference, September, pp. 1247–1257.
Mishra, A. K., Sudarsan, J. S., & Nithiyanantham, S. (2021). Assessment of time–cost model of public health buildings in Nepal. Asian Journal of Civil Engineering, 22(1), 13–22. https://doi.org/10.1007/s42107-020-00294-4
Mishra, Y. (2001). Telecom infrastructure in rural India. Indian Journal of Public Administration, 47(3), 426–433. https://doi.org/10.1177/0019556120010312
Naderpour, A., Sardroud, J. M., Mofid, M., Xenidis, Y., & Rostam, T. P. (2019). Uncertainty management in time estimation of construction projects: A systematic literature review and new model development. Scientia Iranica, 26(2), 752–778. https://doi.org/10.24200/sci.2017.4605
National Conference of State Legislatures. (2020). Challenges facing rural communities. https://www.ncsl.org/research/agriculture-and-rural-development/challenges-facing-rural-communities.aspx. Accessed 5 July 2020.
Olanrewaju, O. A., & Olabanjo, A. G. (2020). An expert system for rural water supply management. International Journal of Innovative Research and Development, 9(8), 19–27. https://doi.org/10.24940/ijird/2020/v9/i8/jul20049
Osello, A., Rapetti, N., & Semeraro, F. (2017). BIM methodology approach to infrastructure design: Case study of Paniga Tunnel. IOP Conference Series: Materials Science and Engineering. https://doi.org/10.1088/1757-899X/245/6/062052
Perttula, P., Merjama, J., Kiurula, M., & Laitinen, H. (2003). Accidents in materials handling at construction sites. Construction Management and Economics, 21(7), 729–736. https://doi.org/10.1080/0144619032000087294
Project Management Institute (PMI). (2011). Practice standard for earned value management (2nd ed.). Project Management Institute.
Punmia, B. C., & Khandelwal, K. K. (2006). Project planning and control with PERT and CPM (4th ed.). Lakshmi Publication.
Raya, R. K., & Gupta, R. (2020). Rural community water management through directional tunnelling: Visual modelling of rainwater harvesting system. Water Practice and Technology, 15(3), 734–747. https://doi.org/10.2166/wpt.2020.060
Sobhkhiz, S., Taghaddos, H., Rezvani, M., & Ramezanianpour, A. M. (2021). Utilisation of semantic web technologies to improve BIM-LCA applications. Automation in Construction, 130, 103842. https://doi.org/10.1016/j.autcon.2021.103842
Suárez, D., Díaz-Puente, J. M., & Bettoni, M. (2021). Risks identification and management related to rural innovation projects through social networks analysis: A case study in Spain. Land. https://doi.org/10.3390/land10060613
Tang, Y., Wang, G., Li, H., Cao, D., & Li, X. (2019). Comparing project-based collaborative networks for BIM implementation in public and private sectors: A longitudinal study in Hong Kong. Advances in Civil Engineering. https://doi.org/10.1155/2019/6213694
Tran, D. Q., Hallowell, M. R., & Molenaar, K. R. (2015). Construction management challenges and best practices for rural transit projects. Journal of Management in Engineering, 31(5), 04014072. https://doi.org/10.1061/(asce)me.1943-5479.0000297
Turkyilmaz, E., & Kizilkan, M. B. (2019). A conceptual idea of participatory design with BIM. Environment-Behaviour Proceedings Journal, 4(11), 23. https://doi.org/10.21834/e-bpj.v4i11.1737
UK Essays. (2018). Why many projects fail at rural areas construction essay. https://www.ukessays.com/essays/construction/why-many-projects-fail-at-rural-areas-construction-essay. Accessed 10 July 2021.
United BIM. (2020). Benefits of BIM implementation. https://www.united-bim.com/5-benefits-of-bim-implementation/ . Accessed 20 June 2020.
Vilventhan, A., Razin, S., & Rajadurai, R. (2021). 4D BIM models for smart utility relocation management in urban infrastructure projects. Facilities, 39(1–2), 50–63. https://doi.org/10.1108/F-08-2019-0091
von Korff, Y., Daniell, K. A., Moellenkamp, S., Bots, P., & Bijlsma, R. M. (2012). Implementing participatory water management: Recent advances in theory, practice, and evaluation. Ecology and Society. https://doi.org/10.5751/ES-04733-170130
Wang, J., Zhang, X., Shou, W., Wang, X., Xu, B., Kim, M. J., & Wu, P. (2015). A BIM-based approach for automated tower crane layout planning. Automation in Construction, 59, 168–178. https://doi.org/10.1016/j.autcon.2015.05.006
Waridin, W., Dzulkhijiana, A., & Mafruhah, I. (2018). Community empowerment in rural infrastructure development program. Economic Journal of Emerging Markets, 10(1), 8–14. https://doi.org/10.20885/ejem.vol10.iss1.art2
Wei, X., Bonenberg, W., & Zhou, M. (2020). The application of BIM in the “China Beautiful Rural” design project—Yangyou Village river ecological landscape reconstruction design project. Advances in intelligent systems and computing. (Vol. 966). Berlin: Springer International Publishing.
Wong, H. L., Luo, R., Zhang, L., & Rozelle, S. (2013). Providing quality infrastructure in rural villages: The case of rural roads in China. Journal of Development Economics, 103(1), 262–274. https://doi.org/10.1016/j.jdeveco.2013.03.002
Yin, S. X., Li, H. M., Wang, A. J., & Sha, M. (2014). The evaluation research on the rural infrastructure construction of Shaanxi based on Grey-AHP. Advanced Materials Research, 869–870, 172–177. https://doi.org/10.4028/www.scientific.net/AMR.869-870.172
Zhou, W., Qin, H., Qiu, J., Fan, H., Lai, J., Wang, K., & Wang, L. (2017). Building information modelling review with potential applications in tunnel engineering of China. Royal Society Open Science. https://doi.org/10.1098/rsos.170174
Zhu, B., Zhang, W., Du, J., Zhou, W., Qiu, T., & Li, Q. (2011). Adoption of renewable energy technologies (RETs): A survey on rural construction in China. Technology in Society, 33(3–4), 223–230. https://doi.org/10.1016/j.techsoc.2011.09.002
Acknowledgements
The authors would like to acknowledge the valuable comments and suggestions of the anonymous reviewers, which helped in improving this paper’s content significantly.
Funding
The implementation of the rural water management system in Ramnathpura, India, was funded by the Department of Science and Technology, India (Project No. DST/TM/WTI/2K16/204). All the results, discussions, and conclusions conveyed through this research are those of the authors and do not implicate the opinions of the Department of Science and Technology, India.
Author information
Authors and Affiliations
Contributions
All authors contributed to the study conception and design. All authors read and approved the final manuscript.
Corresponding author
Ethics declarations
Conflict of interest
On behalf of all authors, the corresponding author states that there is no conflict of interest.
Additional information
Publisher's Note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Rights and permissions
About this article
Cite this article
Raya, R.K., Gupta, R. Application of BIM framework on rural infrastructure. Asian J Civ Eng 23, 249–268 (2022). https://doi.org/10.1007/s42107-022-00421-3
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s42107-022-00421-3