Determinants of rework in building construction projects

Peter E.D. Love (We‐B Centre, School of Management Information Systems, Edith Cowan University, Churchlands, Perth, Australia)
David J. Edwards (Department of Civil and Building Engineering, Loughborough University, Off‐highway Plant and Equipment Research Centre (OPERC), Loughborough, East Midlands, UK)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Article publication date: 1 August 2004

3763

Abstract

Rework represents the unnecessary effort of redoing a process or activity that is incorrectly implemented the first time. Using a structured questionnaire survey, the causes and costs of rework in 161 Australian construction projects were identified. Respondents were invited to indicate direct and indirect rework costs that would be subsequently combined to produce a total rework cost (TRC) figure. Stepwise linear multiple regression analysis was then used to determine a model that included an optimum mixture of significant variables that contributed or lead to a reduction in TRC for the projects sampled. The research revealed that rework per se can negatively influence project safety. Client initiated changes and ineffective use of information technology by the design professionals were identified as being significant variables contributing to rework occurrence. Contrary to an earlier presupposition, design scope freezing was also identified as being a significant factor that can contribute to rework.

Keywords

Citation

Love, P.E.D. and Edwards, D.J. (2004), "Determinants of rework in building construction projects", Engineering, Construction and Architectural Management, Vol. 11 No. 4, pp. 259-274. https://doi.org/10.1108/09699980410547612

Publisher

:

Emerald Group Publishing Limited

Copyright © 2004, Emerald Group Publishing Limited

Related articles