Incorporating overall probability of system failure into a preventive maintenance model for a serial system
Journal of Quality in Maintenance Engineering
ISSN: 1355-2511
Article publication date: 1 December 2002
Abstract
This paper develops a model that allows consideration of not only the total maintenance costs but also the overall probability of a system breakdown when determining the time intervals between preventive maintenance activities. Using the model, which assumes that component failures follow a Weibull distribution, managers can determine the required preventive maintenance interval to achieve a desired probability of system failure, and they can calculate the total expected costs of both breakdowns and maintenance actions. The model’s application is illustrated using the impact of four different maintenance policies. The model assures top management that the unavailable system time due to equipment breakdown will be within a specified limit.
Keywords
Citation
Kardon, B. and Fredendall, L.D. (2002), "Incorporating overall probability of system failure into a preventive maintenance model for a serial system", Journal of Quality in Maintenance Engineering, Vol. 8 No. 4, pp. 331-345. https://doi.org/10.1108/13552510210448531
Publisher
:MCB UP Ltd
Copyright © 2002, MCB UP Limited