To read this content please select one of the options below:

Post-contract material management and waste minimization: An analysis of the roles of quantity surveyors

Abdullahi Babatunde Saka (Department of Building and Real Estate, Hong Kong Polytechnic University, Kowloon, Hong Kong)
Fatai Oladayo Olaore (Department of Construction Management, Nottingham Trent University, Nottingham, UK)
Timothy Oluwatosin Olawumi (Department of Building and Real Estate, Hong Kong Polytechnic University, Kowloon, Hong Kong)

Journal of Engineering, Design and Technology

ISSN: 1726-0531

Article publication date: 23 April 2019

Issue publication date: 5 August 2019

957

Abstract

Purpose

This paper aims to assess the level of awareness of quantity surveyors in material management and their key roles in waste minimization during the post-contract stage of the project with a view of achieving value for money in their roles.

Design/methodology/approach

This involves administering a questionnaire survey to registered members of the Nigerian Institute of Quantity Surveyors, the only recognized professional body of quantity surveyors in Nigeria, within Lagos state. The empirical questionnaire survey succeeds a literature review that isolates the key strategies used by quantity surveyors in material management and waste minimization at the post-contract stage. The validity of the questionnaire was carried out by two experienced construction industry researchers and three experienced professional quantity surveyors to ensure that the questionnaire was not ambiguous and that it consists of the right questions in tandem with the research. The respondents were grouped into consultant’s QS and contractor’s QS.

Findings

Key roles of quantity surveyors during the material management process are proper material storage, and material inventory and accounting are the most important material management and waste minimization practices during the institute stage. It revealed that there is a lack of material waste documentation practices during the construction stage. In addition, there is no statistically significant difference in the responses of the two groups. This may be because there is no clear compartmentalization between the practices of the two groups. In addition, these two groups had the same education training, as there is no difference between the educational training of the consultant’s QS and contractor’s QS.

Originality/value

This study assessed the quantity surveyors’ roles with regard to material management and waste minimization. It would add to the scanty research work in this area. The study has also successfully revealed the strategies that are to be adopted by the quantity surveyors to achieve value for money during the post-contract stage.

Keywords

Citation

Saka, A.B., Olaore, F.O. and Olawumi, T.O. (2019), "Post-contract material management and waste minimization: An analysis of the roles of quantity surveyors", Journal of Engineering, Design and Technology, Vol. 17 No. 4, pp. 793-807. https://doi.org/10.1108/JEDT-10-2018-0193

Publisher

:

Emerald Publishing Limited

Copyright © 2019, Emerald Publishing Limited

Related articles