A Case Study on the Project Benefit of Digital Fabrication in Construction Projects

건설 프로젝트에서 디지털 패브리케이션의 프로젝트 이점에 대한 사례 연구

  • 정의석 (한양대학교 건축공학과) ;
  • 김성진 (디지털건축연구소 위드웍스) ;
  • 함남혁 (한양대학교 건축환경공학과) ;
  • 문성곤 (스윈번 공과대학교 토목건설공학과) ;
  • 김재준 (한양대학교 건축공학과)
  • Received : 2018.05.31
  • Accepted : 2018.06.04
  • Published : 2018.06.30

Abstract

Recently, the free-form buildings are continuously increasing in the world. However, due to the shortage of experience and technology in the project of the free-form buildings, problems such as increase of construction cost, increase of air and deterioration of construction quality are occurring. In this study, data on the 27 free-form projects in Korea and abroad using digital fabrication were collected through the journals, reports, articles, and websites of the institutes and case studies were conducted based on the collected data. Based on the following case analysis, we conducted evaluation of case data analysis based on the knowledge domain specified in PMBOK. Evaluation of case data analysis shows that the application of digital fabrication is divided into positive and negative effects for each knowledge area in the free-form building project. Using the results of the analysis, we can confirm the knowledge field showing the positive effect on the free-form building project by using digital fabrication. However, the data scale of the project using the digital fabrication is not realized at present and research is insufficient. In Korea, a small number of specialists were interviewed and verified because experts do not exist much in korea. Therefore, this study is expected to suggest the necessity of applying digital fabrication in the free-form building projects in the construction industry.

Keywords

References

  1. AIA, AIA TAP BIM AWARDS, 2005-2016, http://www.aia.org/ aia-architects (Oct, 05, 2016)
  2. An, J. (2011). A study on the lessons learned for improving efficiency of free-form facade construction. A Master of Science Thesis, Seoul National University of Science And Technology, pp. 22-35.
  3. Bryde, D., Broquetas, M., & Volm, J. M. (2013). The project benefits of building information modelling (BIM). International journal of project management, 31(7), pp. 971-980. https://doi.org/10.1016/j.ijproman.2012.12.001
  4. Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2011). BIM Hanbook: A Guilde to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors. Wiley, New Jersey.
  5. Grilo, A., & Jardim-Goncalves, R. (2010). Value proposition on interoperability of BIM and collaborative working environments. Automation in Construction, 19(5), pp. 522-530. https://doi.org/10.1016/j.autcon.2009.11.003
  6. Guzik, A. (2009). Digital fabrication inspired design: Influence of fabrication parameters on a design process, University College London, pp. 71.
  7. Ham, N. H., & Kim, J. J. (2015). A Case Study on BIM Operating and Performance Measurement in Construction Phase. Journal of KIBIM, 5(2), pp. 1-11. https://doi.org/10.13161/kibim.2015.5.2.001
  8. Kang, T. W. (2015). Digital-based Robotic Architecture and Smart Factory Technology, Architecture, 57(7), pp. 39-45.
  9. Kim, S. J., Park, Y. M., & Park, S. J. (2015). Review of Freeform Buildings using the Digital Fabrication. Journal of the Korea Institute of Building Construction, 15(2), pp. 175-176.
  10. Kim, S. J., Park, Y. M., & Park, J. J. (2017). Review of Freeform Buildings using CNC T-BAR System. Journal of the Korea Institute of Building Construction, 17(1), pp. 58-59.
  11. Kim, S. J., Park, S. J., & Ryu, H. K. (2014). Necessity Review of IPD(Integrated Project Delivery) for Free-Form Building in Domestic. Journal of the Korea Institute of Building Construction, 14(1), pp. 308-309. https://doi.org/10.5345/JKIBC.2014.14.4.308
  12. Koh, S. H., Ham, N. H., Lee, J. S., Yoon, S. W., & Kim, J. J. (2017). Comparison Analysis of BIM Level in the Domestic and Overseas BIM Projects - Focused on BIM Jornal and Award Winning Projects, KIBIM Magazine, 7, pp. 25-35.
  13. Kwen, S. H., Shim, H. W., & Ock, J. H. (2011). A Study on the Problem Analysis and Quality Improvement in Fabricating Free-Form Buildings Facade Panels through Mock- up Panels Production, Korean Journal of Construction Engineering and Management, 12(3), pp. 11-21. https://doi.org/10.6106/KJCEM.2011.12.3.11
  14. Lee, E. Y., & Kim, Y. S. (2014). An Analysis and Improvement of Free Form Buildings Construction Productivity-Focused on Exposed Concrete Work. Korean Journal of Construction Engineering and Management, 15(3), pp. 38-46. https://doi.org/10.6106/KJCEM.2014.15.3.038
  15. Lee, G. (2011). BIM Reading by 43 Questions, Pixelhouse, Korea, pp. 130-163.
  16. Lim, W. C., & Lee, J. K. (2015). A Stud on Expressive Characteristics of Pavilion Applying Digital Fabrication, Journal of Korea Institute of Spatial Design, 10(6), pp. 66-77.
  17. Maurer, I., (2010). How to build trust in inter-organization projects: the impact of project staffing and project rewards on the formation of trust, knowledge acquisition and product innovation. International Journal of Project Management, 28(7), pp. 629-637. https://doi.org/10.1016/j.ijproman.2009.11.006
  18. Olatunji, O. A. (2011). Modeling the costs of corporate implementation of building information modeling. Journal of Financial Management of Property and Construction, 16(3), pp. 211-231. https://doi.org/10.1108/13664381111179206
  19. PMI. (2008). A Guide to the Project Management Body of Knowledge (PMBOK(R) Guide), 4th edition. Project Management Institute, Newton Square, Pennsylvania, USA.
  20. Ryu, H. K. (2013). 3D Digital Design Optimization Process Considering Constructability of Freeform Structure. Korea journal of construction engineering and management, 14(5), pp. 35-43. https://doi.org/10.6106/KJCEM.2013.14.5.035
  21. Ryu, H. K. (2013). Deduction of Considerations During Design and Construction by Analysis Domestic and Abroad Case Analysis of Freeform Building Envelope. Korea journal of construction eng ineer ing and management, 14(4), pp. 84-96.
  22. Ryu, H. K., & Kim, S. J. (2013). CNC Twisted Tube Method for 3D Coordinate Control Technology for Freeform Structure - Focused on The ARC in DaeGu, Journal of the Korea Institute of Building Construction, 13(5), pp. 434-440. https://doi.org/10.5345/JKIBC.2013.13.5.434
  23. Ryu, H. K., & Kim, S. J. (2016). Implication Deduction through Analysis of Reverse Engineering Process and Case Study for Prefabrication and Construction of Freeform Envelop Panels, Journal of the Korea Institute of Building Construction, 16(6), pp. 579-585. https://doi.org/10.5345/JKIBC.2016.16.6.579
  24. Won, J. S., Lee, J. J., & Lee, G. (2008). A case study on BIM collaboration and information management methods, J. Arch. Inst. Korea, 24(8), pp. 25-32.

Cited by

  1. BIM을 이용한 건설프로젝트의 이점에 관한 사례 연구 - 국내 건축공사 사례를 중심으로 - vol.9, pp.4, 2018, https://doi.org/10.13161/kibim.2019.9.4.010
  2. 특허 동시분류 네트워크 분석을 활용한 BIM 기술구조와 핵심기술 분석 vol.10, pp.2, 2018, https://doi.org/10.13161/kibim.2020.10.2.001