초록

The offshore wind market is growing rapidly as the world is investing heavily in renewable energy to curb rising global temperatures and reduce greenhouse gas emissions. South Korea also announced that it will install 3 GW of onshore wind turbines and 13 GW of offshore wind turbines in the “3020 implementation plan for renewables” announced in 2017. However, the reality of the wind industry is different from the rosy outlook of the government. The “Tamra offshore wind power project” and the “southwest offshore wind power project” have been delayed for a long time. The Korean Wind Energy Society (KWEA) conducted an online survey to determine what domestic offshore wind power experts thought about the delays of the two projects, the technology level and the industry status of domestic offshore wind power. The experts point out that the development of the two projects has been delayed because of difficulties in securing the acceptance of local residents. Many experts answered that the technology gap with Europe is more than 5 years. Wind turbines are a core technology that has the biggest technical gap. The reason for its low profitability was that most experts chose a low wind speed compared to Europe.

키워드

해상풍력발전, 전문가 설문조사, 기술격차, 공급사슬

참고문헌(9)open

  1. [단행본] GWEC / 2018 / Global Wind Statistics 2017

  2. [단행본] Windeurope / 2018 / Offshore Wind in Europe - Key trends and statistics 2017

  3. [단행본] National Planning. / 2017 / Moon Jae-in Government five-year plan

  4. [보고서] KETEP / 2012 / Report on Technology level of Renewable Energy

  5. [보고서] KETEP / 2016 / Report on Technology level of Renewable Energy

  6. [인터넷자료] / 4COFFSHORE

  7. [보고서] KWEA / 2018 / Korea Wind Energy Association 2018 Technical Report

  8. [학술대회] Ryu, J. Y. / 2006 / 750 kW Gearless Type Wind Turbine Generator System / The 2006 Spring Conference of Korean Society for New and Renewable Energy : 245 ~ 248

  9. [인터넷자료] / Electric Power Journal