Analysis on Key Points of the Post-Disaster Reconstruction Engineering Cost Management

Article Preview

Abstract:

Based on the study of some post-disaster reconstruction project examples and related policy documents,this article analyses the existing problems of the post-disaster reconstruction project engineering cost combining with the actual engineering projects of the post-Wenchuan earthquake reconstruction. Then it discusses the factors that affect the post-disaster reconstruction project engineering cost and puts forward some suggestions for it in the end. The study of this paper expects to provide some theoretical and practical references for the subsequent engineering practices, and hopes not only promoting the limited government post-disaster reconstruction special funds to realize their maximum utility, but also enhancing the whole level of our countries'reconstruction management and engineering cost control.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

306-309

Citation:

Online since:

September 2011

Authors:

Export:

Price:

[1] Liliang Jia: Sichuan province will comprehensively complete the post-disaster reconstruction before the end of September 2011. China's radio website,2011. http://www.cnr.cn/china/gdgg/201104/t20110423_507925154.html

Google Scholar

[2] The housing and urban-rural development of People's Republic: Code of valuation with bill quantity of construction works(In Chinese). China plan press(2008), p.1

Google Scholar

[3] Jiuping Xu, Caiyu Sun: Analysis of the factors affecting durations of post-Wenchuan earthquake reconstruction. World Sci-Tech R & D. Vol.30(2008), p.509

Google Scholar

[4] Gongxiang Zhou, YilinYin, Jine Zhou: A Study on the fast construction mechanism of postearthquake reconstruction supportability public project.Soft science.Vol.23(2009),p.3

Google Scholar