Arxiv
2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 Arxiv
Rövşən Azər oğlu İsmayılov
Azərbaycan Dövlət Neft və Sənaye Universiteti
magistrant

DƏRİN QAZMA PROSESİ ZAMANI BAŞ VERƏN BORU TUTULMASI PROBLEMLƏRİ

Açar sözlər: boru tutulması, mexaniki boru tutulması, təzyiqlər fərqi, qazma boruları, qazma məhlulu, quyudibi təzyiq, lay təzyiq

Pipe stick problems of deep well drilling
Summary
The aricle is about the pipe stick problems of  deep well drilling. Pipe stick problem is one of the drilling problems. There are two types of pipe stick problems exist. One of them is differential pressure pipe sticking. Another one of them is mechanical pipe sticking. There are a lot of reasons for pipe stick problems. Indigators of differential pressure sticking are increase in torque and drug forces, inability to reciprocate drill string and uninterrupted drilling fluid circulation.
Key words: pipe stick, mecanical pipe stick,difference of pressure, drill pipe, drilling mud, bottomhole pressure, formation pressure

MƏQALƏNİ YÜKLƏ [202,51 Kb] (yüklənib: 39)


Baxış: 514
Ünvan:
AZ1073. Bakı ş., Yasamal r-nu,
Mətbuat pr., 529-cu məhəllə
“Azərbaycan” nəşriyyatı, 6-cı mərtəbə
Tel.:    +994 12 510 63 99
Mob.: +994 50 209 59 68
           +994 55 209 59 68
© 2019 AEM
E-mail:
[email protected], [email protected]